NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 471 pages

Invoice/purchase record, 1996–2001

Machine-extracted title · confidence 25%

MayoPj presentation-related invoice excerpt; City of Philadelphia reference.

NYC-WTC_000354406–000354876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

provide four times as much light at two-thirds the cost of the present system. The installation of modem lights and poles will illuminate alleys and private streets which will help deter crime throughout the city. Funding for the program is split between the City’s capital budget ($8.14 million) and the City’s Economic Stimulus Program which is administered by the Philadelphia Industrial Development Corporation ($2 million). Completion of the West River Drive Rehabilitation. The Department completed the West River Drive rehabilitation in November 1994, after 15 months of work at a cost of $6.4 million dollars in capital funding, including $4.8 million from the federal government. The renovations have made the drive smoother and, as a result, safer. In addition, the project improved contiguous park amenities such as bike trails and plantings. Improved Pedestrian Safety. The City won the AAA National Award of Merit for Pedestrian Safety for 1994. During 1994, the City reduced the number of pedestrian injuries (2,488) and fatalities (36) to their lowest levels in the 70 years for which such records have been kept. Intersection Safety. In FY93, the Department accelerated a program under which it converted signalized intersections to all-way stop signs; it had already converted 178 intersections in FY93 in addition to 400 intersections done between FY79 and FY92. The program began after several internal studies in the 1970s showed that intersections with all-way stop signs had substantially lower accident rates than intersections with electric traffic signals at low and moderate volume intersections. A Department analysis completed in FY95 compared accident rates at the 178 intersections for the three years before the conversion and for the year after conversion. The comparison showed that the conversions had lowered reportable injury accidents by 40 percent. Additionally, the Department anticipates annual savings from reduced electricity and maintenance costs of up to $800 per intersection. The conversions were made with a number of constraints: conversions would not be done at approved school crossings; at locations within one block of a school; at locations that the Department thought likely to meet a high level of community disapproval; or at locations selectively excluded by members of City Council for safety reasons. In FY95, the Department also completed a $900,000 federally funded capital improvement program to install crosswalks, bike racks, and curb cuts at more than 250 locations. These projects were designed to improve pedestrian safety, ease the use of bicycles by coromuters, and increase access for people with disabilities. Pothole Repairs. The Department continues to meet its goal of having no backlog of reported potholes needing repairs. Potholes are filled within one day of being reported if they are at major arteries in any area of the city, in school crosswalks or if they create emergencies. All other potholes are filled within five days during the Department’s peak season, which is in the spring, and within ten days for the rest of the year. Cave-in Response Coordination. The Department was a key participant in a task force formed by the Managing Director’s Office in October 1994 to coordinate responses to street cave-ins better. The task force was formed after a fatal accident caused by an unfilled cave-in. As a result of the task force’s work, standardized communication procedures have been implemented to ensure a coordinated response to cave-ins from the Department of Streets, the Water Department and the Department of Licenses and Inspections. Responsibility for filling a cave-in Department of Streets Page 279

NYC-WTC_000354745

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354745Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 75

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.943 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

Compare copies and versions →