NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

D ERA R T ME NT OF T R A N S P 0 R T A TIO N

• Rehabilitation work on the Battery Park Underpass, Park Avenue and First Avenue tunnels in Manhattan is scheduled for completion by the end of Calendar 2002. The contract includes the rehabilitation of the mechanical and electrical systems including the ventilation, fire, lighting and drainage systems. The contract has been delayed due to ongoing restrictions at the Battery Park Underpass resulting from the World Trade Center disaster.

• The Westchester Avenue/Hutchinson River Parkway Bridge supports a transit structure and has low clearance over the highway below, since the parkway does not allow trucks. However, trucks illegally use the parkway and the bridge has often been hit. The Department will install an Intelligent Transportation System to detect overheight vehicles. The system will flash signs directing vehicles over nine feet in height to exit the parkway. The project also includes sound-activated cameras that will document damage to the bridge for recoupment of costs by the City. The project is scheduled for completion in Summer 2002.

• A temporary vehicular fly-over bridge will be installed on the Grand Concourse at East 161®' Street prior to the total reconstruction of the 161®' Street underpass. This will allow traffic to flow along the Grand Concourse unimpeded during the reconstruction. Construction of the bridge is scheduled to begin in May 2004.

• The Department is designing the first cable-stayed vehicular bridge to be built in New York City. The four-lane bridge will extend from East 153'‘' Street in the Bronx across the Mott Haven railyards from Morris Avenue to the Grand Concourse just north of Hostos Community College in the Melrose Section. The bridge will restore a link that has been missing since the early 1980s when the turn-of- the-century bridge was closed and demolished. The design and environmental impact assessment phases of the project are currently underway. Final design will begin in April 2002 and take approximately two years to complete.

Street and Arterial Highway Maintenance • During the first four months of Fiscal 2002 DOT resurfaced 388.9 lane miles, compared with 320 lane miles during the same period of Fiscal 2001. The Department plans to resurface 794.4 lane miles in Fiscal 2002, a 100 lane mile increase over last year’s target.

• During the reporting period the Department received 7,612 pothole complaints and repaired 26,968 potholes citywide, compared with 5,625 complaints and 12,754 repairs during the first four months of Fiscal 2001. The Department repaired 53 percent of pothole complaints within 30 days during the first four months of Fiscal 2002, compared to 54 percent during the first four months of Fiscal 2001. Additionally, in October 2001 the Department began deploying extra pothole crews to complete more repairs before winter. By the conclusion of this additional deployment in December 2001, DOT repaired a total of 22,937 potholes.

• As of the end of October 2001, 332 or 92 percent of a total of 362 adoptable miles in the Adopt-a- Highway program were adopted by sponsors, compared to 331 adopted miles at the end of October 2 I. During the first four months of Fiscal 2002, 18 percent of adopted miles were inspected weekly for quality assurance, compared to 21 percent during the same period of Fiscal 2001.

• As of October 2001 the Hamilton Asphalt Plant produced asphalt with an average recycled content of 40 percent, compared to 38 percent as of October 2WiW The plant’s production was 179,073 tons in the first four months of Fiscal 2002, compared with 124,373 tons in the first four months of Fiscal 2001.

• In the first four months of Fiscal 2002 the Department continued performing litter and weed removal on the service roads of the City’s arterial highways. DOT removed 32,518 cubic yards of debris from the highways, compared to 38,267 cubic yards in the first four months of Fiscal 2001.

77

CITY_21MC100_013395151

NYC-WTC_000245538

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245538Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →