NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 67 pages

Table of contents, transportation report, 1990s

Machine-extracted title · confidence 38%

Contents listing for a transportation/public safety report collection.

NYC-WTC_000354877–000354943
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I i

Other Significant FY94 FYS5 FY96 FY97 I

Measurements Actual Actual Actual Actual 1 I Highway Division 14,506 20,052 17,159 19,769 LJ Permits Issued Ditch Restorations Completed 6,719 6,029 5,872 7,222 T Cave-Ins Restored________ 1,242 1,196 1,000 1,272 Traffic Line Striping Square Feet Applied 211,345 470,265 166,917 725,448 Crosswalk Intersections N/A . N/A N/A 1,059

Traffic Engineering Unit Traffic Signal Major Repairs or Revisions — Signal Heads Repaired/Revised ___________ 2,783 3,117 3,085 3,166 Traffic Signal Relamping Program — Intersections Completed _____________ 2,682 3,263 2,401 2,267 Traffic Sign Preventative Maintenance Program — Signs Replaced/Repaired 14,609 13,229 11,337 16,353 Number of Street Name Signs Installed Wl 5,827 4,262 1,817 1,667 Traffic Signal Posts Knocked Down — Days Per Post Repaired 2.0 2.1 1.6 1.5 I ,

\ J Street Lighting Division Street Light Major Repairs________________ 1,971 1,354 1,379 1,373 Response Time for Construction Repairs (in days) 10 5 4 3 V I

Response Time for Major Repairs (in days] 12 12 IJ Engineering. Design, and Surveys City Bridges Designed, Reconstructed, Resurfaced 16 ____ 16 16 ____ 16 Miles of Highways Reconstructed/Resurfaced (51 60 ____ M 58 ____ M Roadways Designed (in linear feet) f®' 284,053 293,039 271,637 254,518 (11 Includes permits for block parties and for the opening of streets. (2) Measures the number of streetlight poles relocated and the number of streetlights replaced with la^r signal heads. IJ (3) The number of traffic lights relamped decreased in FY97 as a result of the installation of Light Emitting Diodes (LEDs) tn traffic lights in need of relamp­ ing. In previous years, telamptng was a relatively quick prxess, involving only the installation of a new bulb. Although LEDs save money by using less energy, their installation is a much more time consuming process. (4) FY94 and fY95 were part of a concerted citywide effort to install new street signs throughout the dty. After the program was completed, the number of street signs installed dropped because it included only replacement of damaged street signs and a few remaining new installations. LJ (5) The number of miles la sd is separate from the number of miles resurfaced during the Highv^ Reengineering Pilot All miles repotted by Engineering, Design, and Surveys ate streets that were reconstnictad and than resurfaced, including the widening of sidewalks and the redesign of streets. The streets to be reconstructed ate selected by the Department’s Highway District Engineers and Traffic Engineers. The number of miles reconstructed/resurfaced depends on the complexity of the projects chosen. (8) The number of roadways designed varies according to the complexity of the projects chosen. The decrease in the number of linear feet of roadways designed in FY97 was caused by the selection of mote complex projects than in FY96.

— Citizen Survey Responses The citizen satisfaction sutvey ^cwed that whSe respondents were generally satisfied Respondents Said That Streets Were in with die overall quality of dty streets, they were not happy with die street repair Good or Mostly Good Condition process. A large majority of respondents — 70 percent — felt that streets in their neighborhood were in good or mostly good condition. Just over half of all respondents, however, expressed dissatisfaction with the street repair process. The Streets Depart­ Many Bad ment anticipates that its reengineering of its street resurfacing process (which is dis­ cussed in the Key Measurements section of this chapter) should improve perceptions Spots 30% Good Condition ■ ofthat process by doubling the resurfacing capabSity of each crew, thereby reducing AU Over 15% die time it takes to repair streets and improving street repair service. Mostly Good But a Few Bad Spots The survey also found that respondents were pleased with the level of street light­ 55% ing. Of those who responded, 66 percent felt that streetiights provided adequate lighting in their neighborhood at night

34 Mayor’s Report on City Senices

NYC-WTC_000354907

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354907Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →