NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 471 pages

Invoice/purchase record, 1996–2001

Machine-extracted title · confidence 25%

MayoPj presentation-related invoice excerpt; City of Philadelphia reference.

NYC-WTC_000354406–000354876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Traffic Signal Modernization. By the end of FY98, the Department will have modernized traffic signals at nearly 500 intersections with $20 million of capital funding, helping to combat a growing problem of aging traffic-signal equipment. Over two-thirds of the City’s 2,900 signalized intersections were originally signalized at least 40 years ago. During FY97 and FY98, the Department will modernize signals in Center City and link those signals to signal control centers. Another 300 signals in the Northeast will also be modernized. The new signals will improve traffic flow through coordination of traffic signals. Highway Reengineering. The Department’s Highway Division has undertaken a project to reengineer the way in which it conducts its business. The project will require $2.4 million in new paving, linestriping, and ditch restoration equipment but will not require any new personnel. Under its plan, the Division will redeploy its staff so that it will have a number of employees in a central repair facility whom the department will be able to deploy to provide the services for which they are most needed. Additionally, the Department will change work processes and increase staff training. The plan, which will not increase the City’s net combined operating and capital costs, will lead to a number of service improvements including:

Elimination of a 700-mile backlog of streets in need of repair by FY2023 with a reduction to 575 miles FY2(X)1; 9 Elimination of a 4,500 ditch backlog by FY2000; A decrease in ditch repair response time from 90 days to 30 days and an increase in the number of ditches projected to be repaired between now and FY2000 from 43,000 to 54,000; An increase in the annual number of intersections with new crosswalks from 2,000 to 3,000 beginning in FY97; • An increase in the annual number of streets with new lane markings from 50 miles to 150 miles beginning in FY97; • A boost in the number miles of road resurfaced through FY2000 from 557 to 760 and; • An increase in the number of lane miles linestriped through FY2000 from 250 without the plan to 750 with the plan.

Department of Streets Page 282

NYC-WTC_000354748

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354748Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

Compare copies and versions →