NYC 9/11 Public Portal Document
Submitted to: Tishman Construction
Attention: Mr. Paul Welsing, Director of Purchasing
666 Fifth Avenue, 36* Floor
New York, New York 10103
All bids must be marked “Sealed bid - Do Not Open: 130 Liberty
North Side Remediation Project”
Submitted byi
Abatement Contractor
Base Bid
The scope of work for this project is the abatement of all asbestos containing and metal
contaminated dust and debris (including all porous materials: all non-asbestos
fireproofing) located on the north side of the construction barrier, from Level B up to the
25* floor at 130 Liberty Street, in accordance with Ambient Group, Inc. specification
#220201 dated 2/25/02 and any addendrun.
All removal shall be performed utilizing full-containment procedures in accordance with
NYC DEP Title 15, Chapter 1 and the appropriate variance attachments. The work shall
be phased in a manner that accurately reflects the layout of the floors, requirements for
waste load-outs and proper entry and egress from the floors via Car #24. The work shall
be completed in eight (8) weeks from the date the work commences. Failure to
complete the work within this timeframe will result in financial penalties.
Contractor’s Base Bid Price to perform all work outlined in Specifications, as listed
above, and as indicated at the pre-bid site inspection:
Removal of all asbestos and metal contaminated dust and
A. debris as indicated in the Scope of Work utilizing full $
containment procedure.
Waste Disposal (as per above).
B. $
Insurance
C. $
Total for Items A, B and C
$