NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

DEP Final Air Monitoring Report, Building

Machine-extracted title · confidence 47%

Final air monitoring report enclosed; clearance inspection following asbestos cleanup.

NYC-WTC_000342636
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RONMENTAL IRPOHATEO The First Choice for Environmental Testing &- Consulting October 4 2001

NYC DEP Mr Krish Radhakrishnan. P E. Director 59-17 Junction Boulevard. S'* Floor Corona. NY 11368-5107 Via Facsimile

Subject Final .Air Clearance Sampling: Gateway Plaza 355 Southend Avenue Building 200: Apartmente-23F. 22F. 34D. 19H. 17B. 16F

•A ■ Dear Mr Radhakrishnan. P E.

Please find enclosed the third pany air monitonng report performed at selected locations of the above referenced location. Upon completion of the asbestos clean up procedures, a visual inspecuon was conducted in the work areas located in the in the specific apartments of the 200 building of the Gateway Plaza. Since no visible asbestos containing matenal (acm) or debris was seen, final air clearance sampling was then conducted.

The air sampling and analysis were done utilizing applicable Federal. State and City Reaulations pertainins 10 asbestos to indude Federal OSHA (29 CFR 1926.58) EP.A YESHAPS (40 CFR PART 61 t. AND TSC.A TITLE 11 .AHERA/.ASHARA (40 CFR PART '7631 .Asbestos Regulations, the New York State Department of Labor Industrial Code Rule 56 and the New York City Department of Environmental Protection Title i

f Asbestos Regulations.

The air samples were collected by Alvin B Blake a licensed sampling technician (AH#01 -03528) under the supervision of .Amenco Rodnguez Jr . a licensed project monitor (AH# 89-07160) 11 % ATC Associates (ELAP #10879) analyzed the samples using the Transmission Electron Microscopy (TEM) Methodology. The results indicated that the work areas achieved the acceptance criteria of at or below <0.01 fibers per cubic centimeters set bv the above regulations.

If you have any questions and/or comments please contact us directly at 212 279-1001.

Sincerely,

la Sarett ■AJ Environmental Inc. / c Richard Lefrak. Charles Mehlman

p vsi )i)ih si red • 1 1 ih Fltmr • \ew ) ork. 'sew ) urk 1OOO1 • 2 ! 2 2. 100 I • SBH 400 i'Ll.- Ilu Ikll.Mu • 'till. • fl'll' Bf.jU'ir.-. I ■ l’'iii.uiflpiii.i lulo; '

u (It .1'ItIIiiiiiiii’Kill..'Ill f /y

CITY_DEP_WORBY_CANNATA_SUBP_000006462

NYC-WTC_000342636

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000342636Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000342627

Subject: final air monitoring report after asbestos cleanup at Building #200.

Similar indexed content

Compare copies and versions →