NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Field inspection report for concrete at WTC paving project (May 2002).
NYC-WTC_000342398OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
MUNICIPAL TESTING LABORATORY, INC. 102 NEW SOUTH ROAD. HICKSVILLE, NEW YORK 11801, 516-938-7120, 516 938-5107 FAX
CONCRETE REPORT ilient: LIRO Group/NYC DDC Attn: Mike Bailey Report Date: 5/30/02 iddress Six Aerial Way Report Number: □0808 Lab#: 1154 Syosset, NY 11791 Date Cast: 4/25/02 Project: WTC Paving Project Contractor: Tully/Grace JT Concrete Plant; N/A ,Strength PSI: 3200 Yards Placed: 1 FIELD INSPECTION REPORT = Pour Location for Set # 1: World Trade Center, Hudson Street (between Duane & Thomas)
Pour Location for Set # 2: Pour Location for Set # 3: Tests made in accordance with ASTM: Yes Not Known X Field Inspector(s) : Client ASTM C 39 COMPRESSIVE STRENGTH TESTS =SS===SS==SS=^===SS=SS=S=
AREA: 28.27 Cylinder Dia: 6" Cylinder ID # Cylinder Set # 1 Date Cast Date Tested Slump Air C143 :173, C23 Unit Wt C138 H Temp F. Truck C1064 No. Tested! Age 1 Load KN strength PSI Required Strength Type Frac
002A 4/25/02 5/2/02 NA NA NA NA NA 7 996.0 7,920 3,200 A 002B 4/25/02 5/23/02 NA NA NA NA NA 28 1128.8 8,980 3,200 A 002C 4/25/02 5/23/02 NA NA NA NA NA 28 1143.1 9,090 3,200 A
Cylinder Set # 2
Cylinder Set # 3
/ Remarks: Cylinders Made By Client
Reviewed By; Daboratory Director Richard Kasparian, P.E ll^^ts are conducted in accordance with ASTM C-39 or AASHTO T-22. By technicians certified by ACl. Municipal Testing is inspected by the Cement and Concrete Reference Laboratory of The National Institute o(
^ds and Technology and is Accredited by: AASHTO and is Licensed by: New York City (* 19] and by The State ot Florida. This report relates only to the item or exact location/item tested.
not to the enttre constructor. It can only be reproduced in ton. and only with Munictos^ Testing Laboralory, tnc. wnnen permission. Our liability is stnctiy limited to the lee paid. Q2.22424Q
CITY_21MC100_004031027
NYC-WTC_000342398
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278482
Field inspection documentation for concrete pours on WTC paving project.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342406
Field inspection report for concrete at WTC paving project (June 2002).
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278481
Field inspection notes and concrete test details for WTC paving project.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290445
Field inspection for WTC concrete; S/W/C locations; June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342334
Municipal Testing Laboratory concrete report for LIRO Group/DDC project.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278489
Field inspection notes for WTC paving concrete pours and tests.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356585
Concrete field inspection report for LIRO Group/NYC DDC – WTC A2/A3, August 2002.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342403
Field inspection report for concrete at WTC paving project (August 2002).
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278483
Field inspection document for concrete strength and pour details.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278482
Field inspection documentation for concrete pours on WTC paving project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278481
Field inspection notes and concrete test details for WTC paving project.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342334
Municipal Testing Laboratory concrete report for LIRO Group/DDC project.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290437
Concrete test report for WTC paving; strength and set information; May–June 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290439
Field inspection report for concrete elements on W.T.C. project; May 2002.
Similar indexed content
NYC-WTC_000278482
Field inspection documentation for concrete pours on WTC paving project.
Similar indexed content
NYC-WTC_000342406
Field inspection report for concrete at WTC paving project (June 2002).
Similar indexed content
NYC-WTC_000278481
Field inspection notes and concrete test details for WTC paving project.
Similar indexed content
NYC-WTC_000278487
Concrete test documentation for WTC paving with strength data.
Similar indexed content