NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 44 pages

OSHA Part 56 asbestos regulations text

Machine-extracted title · confidence 32%

New York DOSH Part 56 asbestos regulations and definitions.

NYC-WTC_000340368–000340411
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYSDOL - DOSH Regulations - Reg Page 39 of 44 Project Background sampling Pre-abatement Abatement Post-abatemen (prior to start of (area (work in t (clearance project) preparation) progress) air monitoring) ------ + Large Asbestos s Project All Required Required Required Required Project s Small Asbesto s Proj ect Ail Required Required Not Required Proj ect Required s Minor Asbesto s Project Not Required , Not Required Not Required s Required

Note: The party conducting the project shall determine the method of analysis which will be utilized to meet the air sampling requirements of this Part (rule). Phase Contrast Microscopy (PCM) is the minimally acceptable method of analysis which may be elected. Transmission Electron Microscopy (TEM) and Scanning Electron Microscopy (SEM) are other acceptable methods of analysis. Whichever methodology is selected must be used consistently for pre-abatement, abatement and post-abatement monitoring. However, where the use of PCM has resulted in fiber counts which exceed the air clearance levels acceptable under this Part (rule), TEM may be utilized to obtain a more accurate asbestos fiber count. Where such election is made, both the PCM and TEM results must be made available to the commissioner or his/her designee in accordance with the provisions of this Part (rule).

^FOOTNOTE - Required on glovebag or tent failure or loss of integrity.

Historical Note: Sec. filed July 7, 1987; amds. filed: Oct. 18, 1991; Oct. 25, 1994 eff. Nov. 9, 1994. § 56-17.2 Pre-abatement and post-abatement monitoring (clearance air monitoring).

(a) Drying time.Sampling shall not commence until:

(1) at least 12 hours after wet cleaning has been completed; and

(2) no visible pools of liquid or condensation remain.

(b) Number of samples-large asbestos projects.Fpr large asbestos project pre-abatement and post-abatement monitoring (clearance air monitoring), a minimum of five area samples inside and five area samples outside each homogeneous work area shall be taken.

(c) Additional samples.In addition to the five-sample minimum requirement set forth in subdivision (b) of this section, one representative area sample, for every 5,000 square feet above 25,000 square feet of floor space, shall be taken.

(d) Number of samples-small asbestos projects.For small asbestos project pre-abatement and post-abatement

http://www.labor.state.ny.us/html/safety/s56.htm 01/20/2001

CrTY_21MC100_012156431

NYC-WTC_000340406

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340406Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →