NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 113 pages

Chain of custody, NY Labor Dept Part 56

Machine-extracted title · confidence 42%

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

NYC-WTC_000446470–000446582
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(V) Incidental disturbance asbestos project - 4 hours (vi) tent with glovebag abatement of TSI - 2 hours (vii) intact transite panel removals indoors - 2 hours (viii) Exterior non-friable ACM abatement without negative - None pressure enclosure (h) Decontamination of Tools & Equipment. All equipment (except negative air ventilation system) and tools shall be removed from the regulated abatement work area and properly decontaminated as per this Part, prior to commencement of clearance air sampling. 56-9.2 Air Sampling Requirements. (a) Personal Air Sampling. Air sampling shall be performed in the worker’s breathing zone, by the asbestos contractor for his personnel, as required by current OSHA regulations.

(b) Daily Air Sampling. Project air sampling shall be conducted daily for the full workshift for Large projects, until satisfactory clearance air results have been obtained for the regulated abatement work area. If more than one (1) daily workshift is required to accomplish the work, air sampling shall be performed on each workshift. Air sampling is not required on days when there are no Phase II C activities.

(1) Number And Location Of Samples - Large Asbestos Projects. A minimum of five (5) samples shall be taken on a daily basis. The location of samples to be taken are the same as specified for Phase HA and I IB. (See Section 56-7.1 and Table 2 within Subpart 56-4)

(2) Work Stoppage Criteria During Phase II C Abatement Procedures. If air samples collected outside the regulated abatement work area indicate airborne fiber concentrations at or above 0.01 fibers per cubic centimeter, or the established background level, whichever is greater, work shall stop immediately for inspection and repair of barriers and negative air ventilation systems as necessary. Clean up of surfaces outside of the regulated abatement work area using HEPA-vacuums and wet-cleaning methods shall be performed prior to resumption of abatement activities. A summary of the elevated results, clean up activities, the results of barrier and negative air system inspections including any necessary repairs, shall be documented in the asbestos abatement contractor supervisor’s daily project log. Work methods shall be altered accordingly to reduce fiber concentrations to acceptable levels.

(c) Exemption From Daily Air Sampling. Daily air sampling is not required on exterior asbestos projects with abatement of non-friable ACM roofing, siding, caulking or glazing compound, tars, sealers, coatings or other NOB ACMs,

12 NYCRR56 Subpart 9, Page 89

CITY_21MC100_011984458

NYC-WTC_000446559

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000446559Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000448811

New York City Part 56 asbestos documentation, NYC-WTC.

Similar indexed content

Asbestos, NY DOL reference

NYC-WTC_000441450

Asbestos standards reference page from NY Department of Labor materials.

Similar indexed content

Compare copies and versions →