NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Invoices for NYU direct reimbursement, Aug 2002

Machine-extracted title · confidence 30%

Direct NYU reimbursement invoices including 90 panels analysis and air monitoring charges, Aug 2002.

NYC-WTC_000340193
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NEW YORK CITY BOARD OF EDUCATION 90 /100 TRINITY PLACE INVOICES FOR DIRECT NYU REIMBURSEMENT

as of August 15, 2002

__________ 1 Contractor Billing I.D. Amount Scope FEMA PW

Submitted Date Albert Kung 1 1 9,616,00 ___________ 90 panels analysis NYU-003 $ 9,616.00 Albert Kung__________ 2 1 8,923,20 90 panels and bridging analysis NYU-003 $ 8,923.20 Athenica 118 1 7,472.00 100 QC air monitoring NYU-004 $ 7,472.00 Athenica 119 $ 3,844.00 90 QC air monitoring NYU-004 $ 3,844.00 NYU-002-$25,955.28 (secondary filters) ineligible- AWL Industries, Inc. 16 $ 111,553.23 100 HVAC rehab Cat. "E" $ 86,597.95 NYU-002~S9,234,70 (secondary filters) ineligible- AWL Industries, Inc. 17 $ 95,929.86 90 t IVAC rehab Cat. "E" $ 86,695.16 Board of Education Custodian PO-1 $ 253,291.72 90,'ICO custodial labor/cleaning NYU-002 $ 253,291.72 NYU-002-$5,312.26 ineligible in propoilion io ineligible AWL Burns and Roe $ 2, 3, 4. 5, 6 31,248.56 90 and 100 Trinity HVAC engineering work (17%) $ 25,936.30 Burns and Roe $ 7,8 6,749.89 90 and 100 Trinity HVAC engineering ineligible-nat 9/11 related $ Corinthian $ 1149 49,000.00 100 air shaft return cleaning/reinsulation NYU-002 $ 49,000.00 Corinthian 1150 $ 2,867.23 ■00 secondary cleaning lower aud. roof NYU-001 $ 2,867.23 □oriel Scaffolding 107 $ 4,500.00 90 plywood wall to close sidewalk for probes NYU-003 £ 4,500.00 DSF (work order) 00024866-03 $ 114.53 1 DO control valves hot water system ineligible-Cat. 'E" $ DSF (work order) 00024866-04 $ 509.63 100 chill water valve ineligible-Cat. ‘E" $ DSF (work order) 00052472-01 $ 1,719.21 100 public address system ineligible-Cat. 'E" $ DSF (work order) 73613 $ 2,112.35 100 plumbing in 12th floor bathroom ineligible-Cat. 'E'' $ DSF (work order) 00090363-01 $ 7,000.00 90/100 plumbing repairs ineligible -Cat. "E" $ DSF (work order) 00092514-08 $ 3,291.58 90/100 glass in walkway ineligible-Cat. $ DSF (work order) 00093067-01 $ 1,886.00 100 locks NYU-003 $ 1,886.00 DSF (work order) 00093074-01 $ 18,144.32 100 locks, doors, door checks ineligible-Cat. 'E" $ DSF (work order) 00093195-01 $ 4,932.29 100 door glass / metal sash windows ineligible-Cat. 'E" $ DSF (work order) 00093200-01 $ 1,690.19 90 glass main entrance doors ineligible-Cat. 'E" $ DSF (work order) 00093200-03 $ 1,571.01 90 doors, wood floor in gymnasium ineligible-Cat. 'E" $ DSF (work order) 00093200-04 $ 4,619.47 90 fire hatch at stairway NYU-003 4,619.47 DSF (work order) 00093322-01 $ 518.83 90 interior glazing $ ineligible-Cat. ’E” DSF (work order) 00093322-02 $ 1,432.21 90 door checks replacement $ ineligible-Cat. 'E'' DSF (work order) 00093322-03 $ 12.24 90 repair locks NYU-003 $ 12.24 DSF (work order for Simplex) 00101279-01 $ 25,647.90 100 repair fire alarm system $ ineligible-Cat. 'E" Kiss Construction 19 $ 514,561.23 90 interior cleaning NYU-004 $ 514,561.23 Kiss Construction 29 $ 1,084,328.82 100 interior cleaning NYU-004 $ 1,084,328.82 KW Tech 03-1001/#! $ 32,610.00 100 ductwork insulation replacement NYU-002 $ 32,610.00 KW Tech 03-1001/#2 $ 5,078.00 100 additional ductwork insulation ineligible-maintenance $ L. Naro 0017J-00 $ 18,187.41 90 glass m lobby ineligible-Cat. 'E" $ National Environmental Safety 3704-2001-#1 £ 3705-2001-#! $ 198,691.00 90 exterior cleaning NYU-001 £ 198,691.00 National Environmental Safety 204,800.00 100 exterior cleaning NYU-001 $ 204,600.00 National Environmental Safety 3705-200!-#2 $ 51,200.00 _______________________100 exterior cleaning NYU-001 $ 51,200.00 National Environmental Safety 3704/5-200!-#1 $ National Environmental Safety 3704/5-2001-#2 $ 28,175.00 90/100 sidewalk bridging NYU-001 £ 28,175.00 10,225.00 National Environmental Safety 3704/5-2001-#1R s 1,481.22 90/100 sidewalk bridging 90/100 sidewalk bridging IB-day rental NYU-001 £ 10,225.00 NYU-001 £ 1,481.22 Safway Steel Products D0055356 $ 82,252.50 90 sidewalk bridge (for panels) (75% billed) _________ NYU-Q03_________ £ 82,252.50 Stance Electric 2041 $ 1,031.58 __________________________90 bridge lighting _________ NYU-003_________ £ 1,031.58 Stanco Electric 2049 $ 717.16 100 restore functioning of exhaust fans 9th floor ineligible-Cat. 'E" £ Stance Electric 2060 $ 1,116.40 100 restore functioning of fan shutdown relays ineligible-Cat. "E" £ Stanco Electric 2073 $ 632.45 100 bridge lighting NYU-003 $ 632.45 Stanco Electric 2074 $ 903.96 100 bridge Itg, trouble-shoot breakers remedy NYU-003 £ 903.96 Stanco Electric 2089 $ 596,52 90 bridge lighting NYU-003 $ 596.52 Stanco Electric 2099 s 847.82 100 bridge lighting NYU-003 £ 847.82 Stanco Electric 2128 $ 608.18 90 bridge lighting NYU-003 £ 608.13 Stanco Electric 2137 $ 471.02 ______ 100 bridge lighting emergency response _________ NYU-QQ3_________ £ 471.02 Taylor Environmental 129 $ 30.928.00 ___________________________ 90 air sampling _________ NYU-004_________ £ 30,928.00 Taylor Environmental 132 $ 32,465.00 100 air sampling _________ NYU-D04_________ £ 32,465.00 Taylor Environmental 139 $ 43.873.00 ion air sampling NYU-004 $ 43,873 00 NYU-001, -002, -003-5696.37 ineligible (fee only) due to 149, 167, 176, 182 $17,411.62 ineligible TDX 199, 207, 226, 257 $ 153,225.54 90/100 CM services (fee and staffing subcontractor costs £ 152,529.17 Trio Asbestos 22 $ 666,946.07 100 interior clean-up _______ NYU-Q04_______ £ 666,946.07 Urban D.C. Inc. 6681 £ 225,225.75 _______ NYU-003_______ £ 225,225.75 V&R Mechanical $ 420,000.00 100 HVAC duct cleaning _______ NYU-002_______ £ 420,000.00 V&R Mechanical 8 (change order) $ 1,500.00 100 damaged ductwork at 6th floor _______ NYU-002_______ £ 1,500.00 V&R Mechanical 18 (change order) $ 966.00 ______ 100 fresh air intake grille coverings/tilters _______ NYU-002_______ £ 966.00 V&R Mechanical 19 (change order) $ 5,049.00 100 clean mixing bexes after new dampers _______ NYU-QQ2_______ £ 5,049.00 V&R Mechanical 20 (change order) $ 1,530.00 ____________100 clean mixing boxes (plenums) NYU-002 $ 1.530 on 100 reclean floors 3,5.7.9,10, basement; inspect V&R Mechanical 56 [change order) $ 205,710.00 11581 $ ___________________ HVAC entire building; etc. NYU-002 J. 205,710.00 V&R Mechanical 398,000.00 90H\/ACductcleaning NYU-Q02 $ 398,000.00 ■ NYU-002-$f0,500 (metal flex) \/&R Mechanical 1 (change orders) 1 16,250.00 9G clean mech. room / replace metal flex __ineljgible2-CaLT^^^^ £ 5,750.00 Warren & Panzer Engineering 138 $ 3,950.jO asbestos monitoring @ 90 Trinity NYU-004 $ 3,950.00

GRAND TOTAL $ 5,104,331.08 $ 4,952,099.56 152,231.52

CITY_2IMC10 0_0 0 9 2 7 9 3 8 7

NYC-WTC_000340193

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340193Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000340189

Direct NYU reimbursement invoices for DOE projects and analyses.

Similar indexed content

NYC-WTC_000340190

DOE invoices for panels and air monitoring analyses, Trinity/NYU records.

Similar indexed content

Compare copies and versions →