Exhibit 1: AMEC debris-monitoring scope, WTC

Machine-extracted title · confidence 46%

Proposed EE tasks for debris clearing and data tracking at former WTC site.

NYC-WTC_000339433–000339434
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Worker Health & Safety

Worker Health and Safety encompasses a range of activities within both the Initial Response/Recovery Phase, as well as (he subsequent Site RestoratiorVCIean-up Phase, as follows:

Site Control/Logistical Support/Recordkeeping a Personnel Monitoring Area Monitoring Reporting Laboratory Management/Data Quality

To date, EE staff working with CMI Health and Safety management, have mobilized to the World Trade Center site to establish site control, implement personnel tracking (recordkeeping), and initiate personnel monitoring. It is expected that, as of today, sufficient staff will be mobilized to provide on-site health and safety management around the dock (i.e. across two 12-hour shifts). Protective outer garments, respirators, and replacement air puryifying cartridges were delivered to the World Trade Center on September 16. Equipment to implement personnel monitoring is in-transit, and such monitoring is expected to be initiated on September 18. Area monitoring will be implemented shortly; data reporting, laboratory management, and data quality activities will evolve subsequent to initiation of the monitoring programs.

Our initial level of effort for this task includes full time/overtime mobilization of two senior health and safety/site management personnel per work shift to cover site operations on a 24/7 basis. It is expected that over the next several weeks, these staff will be supplemented with sample technicians and other personnel, as necessary, to address equipment calibration, maintenance of laboratory chain-of-custody documentation, laboratory coordination, and reporting activities. On a periodic basis, local/regional EE technical staff will perform laboratory data quality review (data validation).

Materials Management/Tracking

FEMA may require the City to enter into contracts that are entirely or partially based on the quantities of debris removed. Consequently, it will be necessary to monitor and document debris removal on an ongoing basis to reduce the potential for discrepancies in load-out quantities occurring weeks or months after the work has been completed. FEMA will implement a 'load ticket' system to record quantities; EE is familiar with this system and can provide training to CM's employees, or provide EE employees to perform this service.

In order to implement documentation of the debris removal process, the FEMA load ticket system should be initiated as soon as practicable. Implementation will require training of on-site staff and the maintenance of a record logging system. Exclusive of data management activities (discussed subsequently below), the level of effort for this task will include a full time materials management manager for the duration of operations, and two on-site technicians per working shift. If the area of AMEC managed debris removal activities expand beyond the current scope, additional field technicians will be required to address the increased work-flow.

Page 2 of 3

CITY_21MC100_005086670

NYC-WTC_000339434

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339434Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

Compare copies and versions →