Exhibit 1: AMEC debris-monitoring scope, WTC

Machine-extracted title · confidence 46%

Proposed EE tasks for debris clearing and data tracking at former WTC site.

NYC-WTC_000339433–000339434
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

EXHIBIT 1

AMEC EARTH & ENVIRONMENTAL. INC. CONSULTING AND ENGINEERING DIVISION PROPOSED SCOPE OF SERVICES

In support of debris clearing activities being performed by AMEC Construction Management, Inc. (CMl) at the former World Trade Center. AMEC Earth & Environmental, Inc. (EE) is currently providing a range of administrative and technical services. These services, initiated on Wednesday September 12,2001, are expected to continue through the initial rescue and recovery operations and subsequently through the site restoration phase. Primary areas of EE involvement are currently represented by the following:

(1) Program Management (2) Worker Health & Safety (3) Materials Management/Tracking (4) Data Management

Tasks (1) and (2) are in progress, with support personnel and equipment either in-place or being processed for assignment. Tasks (3) and (4) represent critical information monitoring and tracking activities that are defined herein, and need a significant mobilization of equipment and personnel to implement.

Each task and an associated level of effort is defined briefly in this introduction. A more thorough definition of the technical considerations ,associated with project tasks is appended to this document, along with the basis and background for personnel and equipment requirements.

Program Management

Executive, regional, and local EE management personnel have been assigned to assist CMl in problem definition, plan development, and plan implementation. To date, problem definition has included identification of the critical task areas defined above, as well as the mobilization of appropriate staff to address plan formulation. Plan development has been completed for each of the task areas, and is contained herein. Plan implementation has been initiated at the Job site relative to critical worker health & safety management. In addition, regional, local, and designated site management personnel have received media coordination training by the GCI Group (September 16,2001).

For the foreseeable future, we expect the level of effort for this task to include direct (/.e, NYC based) oversight of EE activities by local and/or regional EE management staff, as well as selected senior technical experts (i.e., Jeff Sparrow relative to FEMA coordination/materials management issues).

Page 1 of 3

CITY_21MC100_005086669

NYC-WTC_000339433

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000339433Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

Compare copies and versions →