NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

World Trade Dust Cleaning Work Plan Draft

Machine-extracted title · confidence 38%

Draft scope of work for WTC dust cleaning and related regulatory alignment.

NYC-WTC_000332061–000332073
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

by courier for next day delivery to Paradigm Analytical Laboratories at; 2627 Northchase Parkway SE, Wilmington NC 28405

Deliverables

The Project Monitor shall complete chain-of-custody forms and record the number of wipe samples, EPA Project Tracking Numbers, the laboratory address, date, and Opie IDs in an agreed upon electronic format or website approved by EPA wii 24 5 of activity.

14. The Project Monitor shall schedule and oversee ft e cleanin; of the Cleaning Contractor. No residential, common space or M PTC systei leaned until^^e " exterior of the building has been cleaned or has bee- 1 inspect id 1 be free of dust or debris form the collapse of the WTC. No reside; itial or CO)immon spaci shall be c eaned until the HVAC system has been evaluated and i as necessary. 11 a M heduling problem arises the Project Monitor should coriti The Project Monitor shall coordinate daily access for cleaning and sampling lents, owners, the Cleaning Contractor and sampling technicians.

15. The Monitoring Contractor shall pro nde it personnel to provide periodic (3- 4hours/unit) oversight of the Cleaning Con tri ■pfr that work is being conducted in accordance with the Cleaning Contact Scops

16. The Project Monitor shall verify that thi Cleaning Gbntractor is using properly trained and certified NYSDOL and N YCDEP cert! fed worker

17. TheP.roject Moniti conduct ■Rty assurance inspections during the course ot cleaning and e< V initiali eaning Checklist (to be devglrypgd) for tasks coirnlckd in comr the cleaning Contract Scope of Work.

Deliverables

TheProject W 11 submit the completed Cleaning Checklist via F2L or an agreed jCbn altemativi ^format or website approved by EPA within 24 hours of activity.

1 Personal Air Monitoring Personal air monitoring shall be performed by the Monitoring Contractor in accordance with USDOL OShlA retiuircmcnts. The person who conducts sampling shall possess a valid NYS 1)01 ^ciiiilcate. Personal air monitoring will be performed on a minimum of one worker per shift per residence during for the first 6 weeks of cleaning operations. This may be extended based on a determination made by EPA, fuEP and OSHA. Thereafter personal air monitoring samples will be taken at one sample per quadrant per day. All samples shall be collected and analyzed in accordance with NIOSH 7400 Method for PCM and 7402 for TEM. Analysis of these samples shall be the responsibility of the Monitoring Contractor.

9

V

CITY_21MC1OO_OO4O89196

NYC-WTC_000332069

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000332069Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →