World Trade Dust Cleaning Work Plan Draft

Machine-extracted title · confidence 38%

Draft scope of work for WTC dust cleaning and related regulatory alignment.

NYC-WTC_000332061–000332073
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Results of analysis shall provided to EPA by the laboratory in an approved electronic format within 24 hours of collection. Copies of the results shall also be sent immediately to DEP, OSHA and the employer. The employer will make these results available to the employees or their designated representatives for their review in accordance with 29 CFR 1910.1020 and29CFR 1926.1101.

The Monitoring Contractor shall document all the necessary information rej ling sampling activities, fill out all field logs, data sheets, and chain-of-custodyTb le Monitoring Contractor shall use F2L for all sample and chain-of-custody docutiici ton. This data shall be provided to EPA within 24 hours of completion of the sarnliiig

Deliverables j

./The Project Monitor shall submit upon request’ I .ckage consisting d sheets, field notes (copy), and chain-of-custody forms j be delivered to the EPA via ’ email, or an alternative format agreed upon. Thc Mw t Contractor must sign and date all field sheets, field logbooks and chain-of-custody ft Ins (Idt' shall be provided daily upon request at the activity completion.

19. The Project Monitor shall perform final - visi |ns within 2 hours of the completion of the cleaning. If all areas are not dust free then I le Project Monitor will direct the Cleaning Contractor to recL OR as necessan,-’. Liarehs are dust free, then the Project Monitor will authorize final Bmplin^^inal i itions shall be documented using the Cleaning Checklist.

Deliverable!

^Monitor s it to EPA, upon request, copies of the log book pages via e- mi ir aliematr upon format.

20. Post iplin hedurcs a.. Sampiir shall not begin until a visual inspection confirms the absence of visible dust am .ebris. Post cleaning air sampling shall be performed upon successful visual h lection and completed within 24 hours. A successful visual inspection shall be 'inspection that verifies the absence of dust and debris. b. All surfi :s must be completely dry prior to the start of sampling. L c. UPOJ ^mpletion of the cleaning, air sampling will be conducted to verify attainment

■ clean-up criteria. Based on consultation with the resident or owner, aggressive ‘modified aggressive air sampling will be conducted. Residents shall not be present during aggressive air sampling. i. Before begiiming aggressive air sampling, a 1 horsepower electric leaf blower will be used to direct exhaust air against walls, ceilings, floors and other surfaces. This shall continue for at least five minutes per 1,000 square

10

CITY_21MC100_004089197

NYC-WTC_000332070

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000332070Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →