using the aggressive Air sampling method. Standard turn-around time will be used
for all other samples.
h. The Monitoring Contractor will document all the necessary information regarding
sampling activities, fill out all field logs, data sheets, and chain-of-custody forms.
The Monitoring Contractor will use F2L for all sample and chain-of-custody
documentation. Samples must be labeled and accompanied with completed chain-of-
custody forms before shipping to the designated laboratory. The labelmust include
the EPA Project Tracking Number.
1. All information must be maintained using thicsecure B iite (url, user name
and password to be provided by EPA). Imirmation a tig activities (date,
sample ID) shall be provided to EPA, via the \vebsite, w our.' of completion
of sampling. All data shall be inaintamed as confidenti;
Deliverables
The Project Monitor will record equipment used
and size of space daily in the field notebook,
■i iples (leaf blower, fan, etc.)
addition, i late, start and completion dates
for the cleaning, sample media, flow media \ fx tow rates >ian Im. I), flow rate (average),
time (start/finish), total elapsed time iiniiij. culated sr imple volume (L), pump fault,
weather, units, quality assurance sampfoB u bluiM ^^>ling dates and sample
identification numbers (sample IDs), complete i ^custody forms, EPA Project
Tracking Numbers and laboratoiy ariclress shall be' into an agreed upon electronic
foimat or website approved by EPA within 24 hoi of activity.
13. P: ling ani ling Wi 5ng Procedures
a. pject Moml iU collect pre-cleanup and post-cleanup wipe samples at 5
ol ihere^ s cleaned up to a maximum of 50 residences per quadrant as
tedb\ I PA. Rampling will consist of the collection of 3 pre cleaning and
3 post cle ^^^ipe samples for dioxin, total metals and mercury (Note: a separate
vvipesam e IS icquired for each parameter). Metals and mercury wipe samples will
be colled accordance with procedures specified in HUD Appendix 13.1.
Dioxin vj »e samples will be collected in accordance with the procedures specified
in ASTM 16661-01.
le Monitoring Contractor will document all the necessary information regarding
mpling activities, fill out all field logs, data sheets, and chain-of-custody forms.
The Monitoring Contractor shall use F2L for all sample and chain-of-custody
documentation. Samples must be labeled and accompanied with completed chain-of-
custody forms before shipping to the designated laboratory. The label must include
the EPA Project Tracking Number. Samples will be packed, sealed and shipped daily
8