NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 13 pages

Dust Cleaning, Draft 7/10/02, continued

Machine-extracted title · confidence 39%

Continuation of draft scope for indoor cleanup and sampling.

NYC-WTC_000363004–000363016
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

j- The contractor shall document all the necessary information regarding sampling activities, fill out all field logs, data sheets, and chain-of-custody forms. The contractor shall use F2L for all sample and chain-of-custody documentation. Samples must be labeled and accompanied with completed chain-of-custody forms before shipping to the designated laboratory. The label must include the EPA Project Tracking Number. Samples will be packed, sealed anci for analysis to EMSL laboratories at: 307 W. 38* St., New York, New York 212-290-0051. k. All information must be maintained using the secure EPA website (url, user name and password to be provided by EP>^,). Dates for monitoring and/or cleaning shall be provided to EPA and DEP electronically in an EPA apprc within 24 hours. Information on sampling activities (date, sample ID) will bp EPA, via foe website, within 24 hours of completion ofevaluation.

Deliverables iiliiis. The Project Monitor shall review all dcliverabL ibmission to EPA. The review shall assure that each deliverable is accurate and compMi inicdlly sound, and free of clerical errors.

The Project Monitor shall r< ;ord all post-cleaning information in the EPA Indoor Air database or an agreed upon electrqj ic formal. Tins information shall include, but is not limited to sampling technique (aggres Ive or modified aggressive), visually cleaned (Y/N), damage claim (Y N), and post clj |atus (pass/tail). Dates and times shall be associated with all activities including I finish date. ■i■■bk Additional aaation including but not limited to, absence of dust/debris, equipment used (leafbk)we ' ize of space, start a id completion dates for the cleaning, sample media, flow media type, rates (st^final, flow rate (average), time (start/finish), total elapsed time (min), calculi ample volume (L), pump fault, weather, units, QC samples (lot blank). sampling dates, sai |NI|Vs, complete chain-of-custody forms, EPA Project Tracking Numbers and laboratory ad fess shall be entered into an agreed upon electronic format or website ■ approved by EPA within 24 hours of activity. Dates and times shall be associated with all activities including start and finish date. ■I Wl 19. The Project Monitor will complete a daily report which documents cleaning starts, 2 continuations, completions, air sampling, recleaning and any delays or difficulties encountered.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall

CITY_21MC100_000439024 NYC-WTC_000363010

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363010Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →