Retrofitting HVAC Systems, WTC, QA dokument

Machine-extracted title · confidence 38%

Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.

NYC-WTC_000322244–000322270
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

books, papers, toys, supplies, computers, fixtures, furniture, cabinets, lockers, etc.) were damp-wiped and/or Hepa-vacuumed. Where necessary, scaffolding was setup to clean the vents and ceilings. Fabric items were HEPA- vacuumed three times and rugs were sent out for professional cleaning. The SCA also power-washed the exterior of the building and cleaned the windows, including the window wells.

Locker/Bookbaqs

The custodian removed the locks on all lockers so the SCA could clean the lockers. The custodian placed all items in plastic bags and sealed the bags. ATC Associates took wipe samples of items inside the plastic bags and analyzed the samples for asbestos. No asbestos was detected in any of the samples. At the Union’s request, BOE DSF EHS HEPA-vacuumed each of the items in all the plastic bags prior to removal.

5.04 Heating, Ventilation, and Air-Conditioning (HVAC) Units and Individual Unit Ventilators (Univents) The building engineer shut down the HVAC system and the outside air dampers on each air-handling unit and unit ventilator at the time of the evacuation and prior to the collapse of the two towers. This action minimized the amount of debris infiltrating Into the 10 air-handling units and 93 unit ventilators.

An HVAC/duct cleaning contractor cleaned all components and ductwork in the HVAC system and the 93 unit ventilators. The contractor washed, HEPA-vacuumed and disinfected the ductwork and each component of the 10 air-handling units (outside air chamber, mixing chamber, fan coils) and of the 93 unit ventilators. This included disconnecting and removing each unit ventilator from the wall so that all interior and exterior components including the sleeve to the outside could be cleaned. For each of the 93 unit ventilators, the original insulation was removed and replaced with new insulation. Upgraded filters were installed on each of the air-handling units and unit ventilators. All filters will be inspected on a monthly basis and changed quarterly or as needed.

Prior to the final cleaning, the Union wanted to ensure air quality would not be affected once the ventilation units were turned on. As a precaution, filter material was installed over each supply air diffuser and on the top of the unit vent grilles prior the activation of the mechanical ventilation system. All ventilation units were turned on for approximately 24 hours and then turned off in order to remove all external filter material.

Roof

The SCA removed and replaced all the ballast (gravel) and the underlying insulation on the roof.

A:V_RetR>fitttn9HVAC_R.Caseono.doe

Page 8

CITY_21MC100_009093087

NYC-WTC_000322253

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000322253Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →