NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

MS 89 PS8 occupancy follow-up, post-WTC response

Machine-extracted title · confidence 35%

Document describing MS/PS 85M occupancy and recovery operations related to WTC.

NYC-WTC_000319809–000319819
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

An HVAC/duct cleaning controctor cleaned oil components and ductwork in the HVaC system and the 93 unit ventilators. The contractor washed, HEPA-vacuumed ond disinfected the ductwork end eoch component of the 10 air-handling units (outside oir chamber, mixing chamber, fan coils) ond of the 93 unit ventilators. This included disconnecting and removing each unit ventilator from the wall so thot oil interior and exterior components including the sleeve to the outside could be cleoned. For each of the 93 unit ventilotors, the original insulotion was removed end replaced with new insulation. Upgraded filters were installed on each of the air-handling units and unit ventilotors. All filters will be inspected on a monthly basis ond chonged quarterly or os needed. Please refer to Appendix B for further information regarding the upgroded filters.

Prior to the final cleaning, the Union wanted to ensure air quality would not be affected once the ventilotion units were turned on. As a precaution, filter material was instolled over eoch supply oir diffuser and on top of the unitvent grilles prior to the activation of the mechonicol ventilation system. All ventilation units were turned on for opproximotely 24 hours ond then turned off in.order to.remove all the external filter material. •

Roof The SCA removed and reploccd oil the ballost (gravel) and the underlying insulation on the roof.. _ _ _____ ___ ____ ___ _

Playground

The SCA removed ond cleaned the mats in the ployground and powerwashed all playground areas, including the ploy equipment, after which the mots were re­ installed end secured.

Son The SCA removed 2 inches of topsoil from the school property.

Post-CIecnup Air Monitorinq on Jonuary 10, 2002

After the cleanup the oir was again sampled ond analyzed by Tronsmission Electron Microscopy, .In an effort to provide quality control and ossuronce the Union requested that BOE DSF ond the SCA utilize two third-party air monitoring firms. The two firms were ATC Associates and Athenico Environmental.

At the Union's request, "oggressive" oir monitoring wos conducted as an odditionol precaution after the final cleaning was completed and with the ventilation system operating.

MS 89 Pc-Opening 1/22/OZ 4

.an-A _Yat7u;iL ^nn?’.a ..oaj ; XP -I Qo.on CITY_21MC100_011095651

NYC-WTC_000319812

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000319812Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

Compare copies and versions →