NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

MS 89 PS8 occupancy follow-up, post-WTC response

Machine-extracted title · confidence 35%

Document describing MS/PS 85M occupancy and recovery operations related to WTC.

NYC-WTC_000319809–000319819
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The air samples were token in vorious locations on eoch floor while fans (oggressive sampling) were operated in order to stir up any possible dust and fibers. The 70 samples were onolyzed by TEM. All sample results were well below the 70 s/mm‘ and indicate the school meets local, state ond federal asbestos regulatory criteria for re-occupancy.

At the Union's request the following orrcnqernents have been mode: ’ When school re-opens, the BOE will provide: Additional custodial workers to ossist in any requests for Spot cleaning. The custodiol staff will also have HEPA vacuums on-site that will remain at the school. t rouma counselor: New York City Deportment of Health nurses

9 The Board has removed end reploccd all food items from the kitchen areas.

Occuponts will be instructed to keep windows and other outside entry points closed ond rely on the HVAC (heating, ventilation, and air-conditioning system) end unitvents for filtered air. This will help maintain the effective operation end "air boloncing" of the mechonical ventilation system.

BOE DSF will regularly inspect the roof, playground and other accessible outside oreos for porticulote debris ond wet down ond/or remove any dust and debris. Particular otiention will be poid to the playground equipment and oreos near the outside air intokes.

As a precaution a procedure will be established to shut down the outside air intakes to their minimal setting when outside conditions and/or air monitoring results indicate a potential problem.

Barrier mot(s) will be installed at coch entrance to reduce trocking dust and dirt inside the building and will be cleoned as needed (at leost weekly) when the building reopens.

The Board will develop a written environmental monitoring protocol for the school and will conduct daily air monitoring inside and outside the school for asbestos, respiroble particulates, volatile organic compounds, and carbon monoxide and periodically for other contominonts os necessary. The monitoring protocol will be reevaluated in the near term.

o Adjocent to the north side of Stuyvesant High School, there is a borge tronsfer and loading operation. The debris is unloaded from the trucks ond

MS S9 Re-Opening 1/22/0? 5

on-J cr-CT zriri.r c nsj an&.^^ccr.-CT.) ■ yp -i cccn CITY_21MC100_011095652

NYC-WTC_000319813

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000319813Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

Compare copies and versions →