Retrofitting HVAC report, NYC Ground Zero

Machine-extracted title · confidence 41%

New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.

NYC-WTC_000278790–000278835
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Playground

The SCA removed and cleaned the mats in the playground and power washed all playground areas, including the play equipment, after which the mats were re-installed and secured.

5.05 Post-Cleanup Air Monitoring on January 10, 2002

After the cleanup the air was again sampled and analyzed by Transmission Electron Microscopy. In an effort to provide quality control and assurance, the Union requested that BOE DSF and the SCA utilize two third-party air-monitoring firms. The two firms were ATC Associated and Athenica Environmental.

At the Union’s request, “aggressive” air monitoring was conducted as an additional precaution after the final cleaning was completed and with the ventilation system operating.

The air samples were taken in various locations on each floor while fans (aggressive sampling) were operated in order to stir up any possible dust and fibers. The 70 samples were analyzed by TEM. All sample results were well below the 70 s/mm^ and indicate the school meets local, state and federal asbestos regulatory criteria for re­ occupancy.

• Additional custodial workers to assist in any requests for spot cleaning. The custodial staff will also have HEPA vacuums on-site that will remain at the school. • Trauma counselors • New York City Department of Health nurses • The Board has removed and replaced all food items from the kitchen areas. • Occupants will be instructed to keep windows and other outside entry points closed and rely on the HVAC (heating, ventilation, and air-conditioning system) and unit vents for filtered air. This will help maintain the effective operation and “air balancing” of the mechanical ventilation system. • BOE SDF will regularly inspect the roof, playground and other accessible outside areas for particulate debris and wet down and/or remove any dust and debris. Particular attention will be paid to the playground equipment and areas near the outside air intakes. • As a precaution a procedure will be established to shut down the outside air intakes to their minimal setting when outside conditions and/or air monitoring results indicate a potential problem. • Barrier mat(s) will be installed at each entrance to reduce tracking dust and dirt inside the building and will be cleaned as needed (at least weekly) when the building re-opens.

A:\e_Rrt«>ffillnsHVAC_R.Cas»n«.do« Page 9

CITY_21MC100_010274187

NYC-WTC_000278800

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278800Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →