NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 40 pages

Environmental quality survey for WTC site, May 2002

Machine-extracted title · confidence 50%

May 2002 NYC WTC environmental quality survey prepared by [name], for Colliers ABR.

NYC-WTC_000306124–000306163
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C. Airborne Metals - Ten (10) indoor samples were collected in total. The sample locations included the 33"*, 29®, 20®, 19®, 17®, 12®, 10®, 7®, 5® and C floor. An outside air sample was also collected on the 7® floor. All indoor sample locations were in occupied areas near supply air diffusers. Samples were collected for eight hours at 2 liters/minute. They were analyzed for cadmium, chromium, copper, iron, lead, manganese, nickel, silica and zinc by method NIOSH 7300. All results were below OSHA PEL and American Conference of Governmental Industrial Hygienist (ACGIH) Threshold Limit Values (TLVs). Please refer to Table 1, insert and Appendix A for results and regulatory standards. Please refer to the floor plans in Appendix C and photographs in Appendix D for specific sample set-up and locations.

D. Airborne Mercury - Ten (10) indoor samples were collected in total. The sample locations included the 33^**, 29®, 20®, 19®, 17®, 12®, 10®, 7®, 5® and I® floor. An outside air sample was also collected on the 7® floor. All indoor sample locations were in occupied areas near supply air diffusers. Samples were collected for eight hours at 0.2 liters/minute and analyzed by method NIOSH 6009. All results were below the OSHA PEL and below the ACGIH TLV. Please refer to Table 1, insert and Appendix A and B for results and regulatory standards. Please refer to the floor plans in Appendix C and photographs in Appendix D for specific sample set-up and locations.

II. HVAC System/Visual Inspection

The HVAC system inspection consisted of a visual inspection of the mechanical rooms and associated fan units on the 29“*, 20“*, 19®, 17®, 12®, 10®, 7®, and 5® floors. Please note that an inspection of the interior of associated ductwork was not performed. Also, no data regarding balancing and air velocities were obtained or analyzed. In general, the mechanical equipment rooms (MERs) were clean and well lit. Some of the MERs had stored materials present. There were no dust accumulations in the air mixing chambers of the HVAC units and the filters were in good condition. The coils and condensate drip pans (CDPs) of the HVAC units were clean and there was no standing water present on the day of the survey. The CDP of the west side HVAC unit on the 12® floor, however, needs to be repaired. Please refer to Appendix C for floor plans indicating HVAC unit locations. Please refer to Appendix E for inspection results, and Appendix F for photographs of the individual HVAC units.

Project; 220490 Page 2

CITY_21MC100_003054299

NYC-WTC_000306127

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000306127Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →