HVAC INSPECTION/OBSERVATIONS
An inspection was conducted of the mechanical equipment room and associated TYPHOON
HVAC unit located on the east side of the 29* floor. This unit serves the entire floor. The
following was noted:
Mechanical Equipment Room:
• The mechanical equipment room was well lit, unpainted, and clean,
• There were boxes, a ladder, paint cans and ceiling tiles stored in the room.
• The mechanical equipment room is used as a mixing plenum.
• The pipes were not labeled or color-coded.
Air Mixing Chamber:
• The doors closed tightly.
• The outside air intake was located at least 25 feet from any apparent source of contaminants
and was protected by a bird screen.
• Damper positions for outside air were open at minimum settings.
• Return air dampers were open at maximum settings.
• The fdter bank was framed and contained 15%-25% efficiency, box-type filters which were
in good condition and are replaced approximately every two months.
Coil Chamber:
• The coils were clean and well maintained.
• Condensate drip pans (CDPs) were clean, and there were no odors or signs of standing water,
condensate, and leaks.
Project: 220490