Daily workforce report, World Trade Center site, Feb 2002

Machine-extracted title · confidence 43%

Daily workforce report listing labor classifications and equipment at World Trade Center site.

NYC-WTC_000306054
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 15M5 6(hRoad, Whitestone. N.Y. 11357- (718) 76r-S000 DATE: 2/26/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER FOREMEN 1 CAT 365 GRAPPLER PROJECT ENGINEER 2 CAT 375 GRAPPLER 1 SAFETY ENGINEER 1 CAT 375 BUCKET 1 LABORERS 3 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACH11200 GRAPPLER 1" LOCAL 14 2 185 CFM COMPRESSOR RUNNING UNMANNED LOCAL 15 2 235 HAMMER HOE RAM 1 CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN TOOLTRUCK TEAMSTERS (FUEL) 1 TOOL VAN MECHANICS 2 ROLLOFF HOUSE WRECKERS ■ DUMP TRAILERS ■ LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK

1 DELIVERIES: FUEL TRUCK PICKUP TRUCKS 1 5 ‘NOTE: LIGHT TOWERS RAN 2 HOURS LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK DELAYS: TRUCK 63, 65, & 70 EACH HAD A DELAY OF ABOUT FLASHING ARROW BOARD 1 45 MINUTES DUE TO WORK ON GPS UNITS OFFICE TRAILER/GENER. 1 ____________ T99 DOWN 30 MIN. W/FLAT TIRE_____________ CARGO BOXES 4 "NOTE: HITACH11200 DOWN @ 2:00 PM, ■ FLAT TRUCK 1 USED THE 375 GRAPPLE FROM 2:00 UNTIL 7:00 PM ■ PUMP 2

Description of Work: COMPLETED WORK:________________________________________________________________________________________ is CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA_____________________________________________________________ CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE____________________________________________ T67 DELAYED 1730-END OF SHIFT FOR HITACHI COMPUTER RECOVERY (ACCIDENTALLY LOADED INTO TRAILER) AND TIRE CHANGE

GRACE CONTRACTING CORP I 5 Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0226D.xls 02.415864 1 CITY_21MC100_004048868

NYC-WTC_000306054

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000306054Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →