Daily work force report, World Trade Center site, Feb 3,

Machine-extracted title · confidence 46%

Daily workforce roster and equipment listing for World Trade Center construction crew.

NYC-WTC_000429455
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6lh Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE; 2/3/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location. World Trade Center Contract No. Weather Conditions:

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN________________________________ 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS______________________________ 2 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES; SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD *NOTE* 1- 375 RAN TILLL 9:30 AM 750 RAN 9:30 AM OFFICE TRAILER/GENER. 1 TILL END OF SHIFT CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

LIGHT TOWERS TO BE USED FOR 2.5 HOURS ‘COMPRESSOR RAN DURING SHIFT UNMANNED*

Description of Work:______________________________________________________________________ PRELIMINARY WORK:___________________________________________________________________ CONTINUING TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 'maintaining TRAFFIC FLOW INTO AND OUT OF AREA RECORDING TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT; 95 YOKES; 84 DOT LOADS; 87

GRACE CONTRACTING CORP Approved By: BY: Title; For: SUPERINTENDENT

DAILY WORK FORCE REPORT0203D.xls 02.217519

CITY_2IMCl0 0_0 010 4 8110 NYC-WTC_000429455

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000429455Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →