GRACE CONTRACTING CORP. 151.46 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/3/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions:
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT________________________ CAT 966 LOADER 1 PROJECT ENGINEER CAT 365 GRAPPLER 1 OFFICE ENGINEER 1 CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* !IRON WORKERS 235 HAMMER HOE RAM 1 ILOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 [TOOL TRUCK 1 CARPENTER 1 IrrOOL VAN CARPENTER FOREMAN 1 ■ ROLLOFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 ■ DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 ■ LOW BED TRAILER MECHANICS 2 ' HIGH DECK TRAILERS 2 HOUSE WRECKERS ' WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD *NOTE‘ 1-375 RAN TILLL 9:30 AM 750 RAN 9:30 AM OFFICE TRAILER/GENER. 1 TILL END OF SHIFT CARGO BOXES 4 FLAT TRUCK 1 PUMP 2
LIGHT TOWERS TO BE USED FOR 2.5 HOURS ‘COMPRESSOR RAN DURING SHIFT UNMANNED*
Description of Work: PRELIMINARY WORK:__________________________________________________________________ CONTINUING TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINING TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORDING TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 95 YUKES: 84 DOT LOADS: 87
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0203D.xls
CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 CITY_21 MCI 00_013525234
NYC-WTC_000237690
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000322601
Day final workforce and equipment listing for World Trade site, Feb 2, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305183
Daily workforce and equipment for World Trade, Jan 29, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291339
Day final daily workforce and equipment for World Trade Center, Feb 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305504
Night final daily workforce and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322127
Night daily workforce and equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305177
Daily labor/equipment roster for World Trade, Jan 26, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305122
Daily labor/equipment summary for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342323
Day shift daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000322601
Day final workforce and equipment listing for World Trade site, Feb 2, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305183
Daily workforce and equipment for World Trade, Jan 29, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291339
Day final daily workforce and equipment for World Trade Center, Feb 3, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000322601
Day final workforce and equipment listing for World Trade site, Feb 2, 2002.
Similar indexed content
NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
Similar indexed content
NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
Similar indexed content
NYC-WTC_000429455
Daily workforce roster and equipment listing for World Trade Center construction crew.
Similar indexed content
NYC-WTC_000305183
Daily workforce and equipment for World Trade, Jan 29, 2002.
Similar indexed content