Daily work force report, World Trade Center, Feb 3, 2002

Machine-extracted title · confidence 95%

Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.

NYC-WTC_000237690
Page image
Scanned page image, NYC-WTC_000237690
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.46 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/3/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions:

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT________________________ CAT 966 LOADER 1 PROJECT ENGINEER CAT 365 GRAPPLER 1 OFFICE ENGINEER 1 CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* !IRON WORKERS 235 HAMMER HOE RAM 1 ILOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 [TOOL TRUCK 1 CARPENTER 1 IrrOOL VAN CARPENTER FOREMAN 1 ■ ROLLOFF TEAMSTERS (FUEL. TRAILER DELIVERY) 1 ■ DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 ■ LOW BED TRAILER MECHANICS 2 ' HIGH DECK TRAILERS 2 HOUSE WRECKERS ' WELDING TRUCK 1 ■ FUEL TRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 5 DELIVERIES: SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD *NOTE‘ 1-375 RAN TILLL 9:30 AM 750 RAN 9:30 AM OFFICE TRAILER/GENER. 1 TILL END OF SHIFT CARGO BOXES 4 FLAT TRUCK 1 PUMP 2

LIGHT TOWERS TO BE USED FOR 2.5 HOURS ‘COMPRESSOR RAN DURING SHIFT UNMANNED*

Description of Work: PRELIMINARY WORK:__________________________________________________________________ CONTINUING TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 MAINTAINING TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORDING TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT: 95 YUKES: 84 DOT LOADS: 87

GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0203D.xls

CONFIDENTIAL, SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008 CITY_21 MCI 00_013525234

NYC-WTC_000237690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000237690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →