GRACE CONTRACTING CORP. 151-45 6lh Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE; 2/3/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location. World Trade Center Contract No. Weather Conditions:
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 365 GRAPPLER 1 OFFICE ENGINEER CAT 375 GRAPPLER 2 FOREMEN________________________________ 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR SEE NOTE* IRON WORKERS 235 HAMMER HOE RAM 1 LOCAL 14 4 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK 1 CARPENTER 1 TOOL VAN CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS______________________________ 2 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 5 DELIVERIES; SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD *NOTE* 1- 375 RAN TILLL 9:30 AM 750 RAN 9:30 AM OFFICE TRAILER/GENER. 1 TILL END OF SHIFT CARGO BOXES 4 FLAT TRUCK 1 PUMP 2
LIGHT TOWERS TO BE USED FOR 2.5 HOURS ‘COMPRESSOR RAN DURING SHIFT UNMANNED*
Description of Work:______________________________________________________________________ PRELIMINARY WORK:___________________________________________________________________ CONTINUING TO REMOVE DEBRIS FROM LOWER LEVELS OF WTC COMPLEX, MACHINES AT EL. B6 'maintaining TRAFFIC FLOW INTO AND OUT OF AREA RECORDING TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT; 95 YOKES; 84 DOT LOADS; 87
GRACE CONTRACTING CORP Approved By: BY: Title; For: SUPERINTENDENT
DAILY WORK FORCE REPORT0203D.xls 02.217519
CITY_2IMCl0 0_0 010 4 8110 NYC-WTC_000429455
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305454
Final daily crew and equipment listing for World Trade Center site, Feb 4, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429421
Day preliminary report of labor and equipment for World Trade Center on 2/1/02.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305485
Day final daily workforce and equipment at World Trade Center site, jan 30 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342325
Day shift daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305122
Daily labor/equipment summary for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305454
Final daily crew and equipment listing for World Trade Center site, Feb 4, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similar indexed content
NYC-WTC_000237690
Day shift final daily work force and equipment log for Grace Contracting Corp. at the World Trade Center site.
Similar indexed content
NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
Similar indexed content
NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
Similar indexed content
NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
Similar indexed content