NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 6 2001

Machine-extracted title · confidence 42%

Day final daily workforce and equipment at World Trade Center site, December 2001.

NYC-WTC_000305609
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. I 151-45 6tti Ro^d, Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 6, 2001 (DAY ) i FINAL ====== ==3^=^^^^==^^^== s=

DAILY WORK FORCE REPORT

_____________ __________ I____________________________ Job Name i Location: World Trade Center Contract N 3. j Weather Conditions i Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN : CAT 365 GRAPPLER 1 SAFETY OFFICER : 1 CAT 375 GRAPPLER 1 LABORERS i 25 HITACHI 750 GRAPPLER 1 IRON WOF^KERS ; 1 HITACHI 550 GRAPPLER 1 LOCAL 14 ; 4 HITACHI 550 GRAPPLER 1 LOCAL 15 i 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 HAMMER HOE RAM 1 TEAMSTEF?S 11 MECHANICS TRUCK 2 MECHANiqS ; 2 TOOLTRUCK 1 HOUSE WF^ECKERS 6 TOOL VAN 1 ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIE,^: AWISCO HIGH DECK TRAILERS 3 AUSTER MiSC WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 USED LIGET TOWERS FOR 2.5 HOURS OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description 'of Work? LOADS OUT 56 YUKE LOADS 50 DELAYS Al|L DAY 1200 -750 -550 DUE TO FIRE DEPT SEARCH AND RECOVERY LOAD OUTlSTEELAND DEBRIS__________________________________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN FRAFFIC FLOW IN AND OUT OF AREA_________________________________________________________ , CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 JOMgET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS; ALL MACHINES LEVEL B-5 253 T GRACE CON\^ClriN<\C Approved By: Title; For: superintendent" \

DAILY WORK FORCE REPORT 1206D.xls

CITY_21MC100_003025900

NYC-WTC_000305609

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000305609Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →