Daily work force report, World Trade Center, Dec 13, 2001

Machine-extracted title · confidence 42%

Night shift workforce and equipment at World Trade Center, Dec 13, 2001.

NYC-WTC_000291365
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I i i GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone.'N Y. 11357-(718) 767-9000 DATE: DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM __^=L=__= :■ T.■ ,^=ag8a'!, '' DAILY WORK FORCE REPORT

I Job Name & Location: World Trade Center Contract No. j Weather Conditions VERY MILD AND FOGGY

Labor Equipment CLASSIFICATKON QUANT. _______ Descriplion______ MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE_______ 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER 1 IRON WORKERS ; HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15_______ , 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS________, 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS . 9 TOOL VAN ROLL OFF DUMP TRAILERS 1200 AND 375 PULLING MATERIAL FROM SLOPE LOW BED TRAILER NORTH OF VISTA & PASSING TO TO 750 - 750 LOADING HIGH DECK TRAILERS TULLY EUKES & FLATS IN BOTTOM OF PIT WELDING TRUCK 973 ALSO LOADING IN BOTTOM_____________________ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES AND 9 FLATS - BELOW________ PUMP 2 78 OUT OF AMEC (53 GRACE, 25 DOS/DOT) ROLLER RAINMAKER/GENIE LIFT 1 550 BUCKET 1 :== Description of Work: WORK PERFORMED_________________________________________ LOAD OUT STEEL AND DEBRIS________________________________ MANNED TARPING AND TRIMMING STATIONS__________________ MANNED WATER STATIONS FOR DUST CONTROL_______________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________ CONTINUE REMOyiNGDKRIS FROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS: ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP Approved By: Title; BY: For: SUPERINTENDENT

DAILY WORK FORCE REPORT 1213N.xl3

CITY_21MC100_003180486

NYC-WTC_000291365

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291365Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →