GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone,* N.Y. 11357-(718) 767-9000 DATE: DECEMBER 5, 2001 (NIGHT FINAL)
DAILY WORK FORCE REPORT
_______________ i_____________ Job Name & Location: World Trade Center Contract No. Weather Conditions
____________________ Labor________ ___________ Equipment i CLASSIFICATION QUANT. Description MANNED STANDBYl IDLE SUPERINTENDENT , 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 SACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 6 Hrs. SHrs.j LABORERS__________ 20 HITACHI 750 GRAPPLER 1 IRON WORKERS ’ HITACHI 550 GRAPPLER 1 i LOCAL 14 5 HITACHI 550 GRAPPLER 1 i LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 6 Hrs. 6 Hrs. TEAMSTERS 10 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 10 TOOL VAN ROLL OFF i DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1
Description of Work: ________________________________________________________________________________ t- LOADS OUT; 27 HI-BEDS/DUMP TRAILERS; 34 EUCLIDS i LOAD OUT STEEL AND DEBRIS_______________________________________________________________________ ; MAN TARPING AND TRIMMING STATIONS_______________________________________________________ ; MAN WATER STATIONS FOR DUST CONTROL ‘ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY ELEVATIONS: ALL MACHINES LEVEL B-5 253___________________________________________________________ j DELAYS FROM 7-10PM FOR FREON RECOVERY; AND MULTIPLE BODY RECOVERIES THROUGHOUT THE NIGHT • GRACE CONTRACTING CORP Approved By: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT 1205N.xls
JL200088
CITY_21MC100_004144451
NYC-WTC_000429737
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361548
Night final daily workforce and equipment for World Trade Center site, Dec 5, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
4 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305599
Day daily workforce and equipment at World Trade Center site, December 2001.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269189
Night final daily workforce and equipment at World Trade Center.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266915
Day shift daily workforce report for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266957
Final day workforce and equipment for World Trade Center project, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388370
Night shift daily workforce and equipment at World Trade site, Dec 5, 2001.
4 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278997
Daytime daily workforce and equipment at World Trade site, December 6, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408086
Night shift daily workforce and equipment roster for World Trade site, Dec 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361548
Night final daily workforce and equipment for World Trade Center site, Dec 5, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305599
Day daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similar indexed content
NYC-WTC_000361548
Night final daily workforce and equipment for World Trade Center site, Dec 5, 2001.
Similar indexed content
NYC-WTC_000278686
Night shift workforce and equipment counts for World Trade Center, December 5, 2001.
Similar indexed content
NYC-WTC_000266918
Night final daily workforce summary for World Trade Center project.
Similar indexed content
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similar indexed content