NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
NYC-WTC_000305366OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6th Roai . Whitestone. N.Y. 11357-(718) 767-9000 DATE; DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name 8 Location: World Trade Center Contract Nc. Weather Co iditions
Labor________ Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTE NDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OF =ICER 1 CAT 375 GRAPPLER 1 18 HITACHI 750 GRAPPLER 1 IRON WORI- ;ers 1 HITACHI 550 GRAPPLER 1 LOCAL14 5 HITACHI 550 GRAPPLER 1 'local 15 7 HITACHI 1200 GRAPPLER 1 CARPENTE T 185 CFM COMPRESSOR 1 CARPENTE FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANIC!! 2 TOOLTRUCK 1 HOUSE WR ECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 AWISCO OXY/ACET WELDING TRUCK 1 AWISCO TIPS FUEL TRUCK 1 AWISCO OXY/ACET PICKUP TRUCKS 7 LIGHT TOWERS 9 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP_________________ 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description <Jf Work: GATEWAY 350 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D 365 1-2PM F IRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25_________________________ CONTINUE rO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC._____________ MANNED tArPING AND TRImMiNG STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2_________________________________ _ CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP WZ AMEC ELEVATIONS: 1200-264. 550-274, 375-284, 365-274 LOADS OUT 49 S. t—or, Approved B); Title:_________ For: SUPERINTENDENT
CITY_21MC1OO_OO43463O9 NYC-WTC_000305366
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419225
Final daily workforce summary for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305242
Day shift final daily workforce report for World Trade Center, with crew and equipment details.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305239
Night preliminary daily workforce report for World Trade Center site, showing crews and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291284
Daily workforce record for World Trade site with equipment and personnel counts (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408035
Day shift workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388194
Daily workforce and equipment roster for World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419225
Final daily workforce summary for World Trade Center site, Dec 1, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305242
Day shift final daily workforce report for World Trade Center, with crew and equipment details.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
Similar indexed content
NYC-WTC_000419225
Final daily workforce summary for World Trade Center site, Dec 1, 2001.
Similar indexed content
NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similar indexed content
NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similar indexed content
NYC-WTC_000305242
Day shift final daily workforce report for World Trade Center, with crew and equipment details.
Similar indexed content