NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Day shift workforce and equipment at World Trade Center site, Dec 1, 2001.
NYC-WTC_000408035OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP.
151-45 61h Road, Whitestone, N.Y. 11357-(718) 7G7-9000 DATE: DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor______ _ Equipment ' CLASSIFICATION UANTITl Description MANNED standby] IDLE! SUPERINTENDENT CAT 966 LOADER ] 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER_______ _ 1 FOREMEN 2 CAT 365 GRAPPLER t __L_ SAFETY OFFICER _ L CAT 375 GRAPPLER 1 LABORERS____________ 18 HITACHI TOT GRAPPLER ] 1 IRON WORKERS HITACHI 550 GRAPPLER t 1 LOCAL 14 __ 5_ HITACHI 550 GRAPPLER ] 1 LOCAL 15 7 HITACHI 1200 GRAPPLE^ 2 (carpenter 195 CFM COMPRESSOR^ 1 CARPENTER FOREMAN 235 HAMMER HOE RAM I 1 'teamsters 11 MECHANICS TRUCK 2 MECHANICS___________ HOUSE WRECKERS _2^ 7 TOOL TRUCK____________ TOOL VAN_____________ i_ 1 1 ROLL OFF_____________ _ DUMP TRAILERS_______ ]_ 7 LOW BED TRAILER i HIGH DECK TRAILERS ] T AWISCO OXY/ACET WELDING TRUCK- 1 AWISCO TIPS FUEL TRUCK___________ _ AWISCO ' OXY/ACET PICKUP TRUCKS LIGHT TOWERS________ 2 _9 SITE MULE 3 DUMPTRUCKS T wheel dumpYruckF FLASHING ARROW BOARD 1_ OFFICE TRAILER/GENErT 2 CARGO BOXES ' 3 FLAT TRUCK 1 PUMP ' 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description of Work: ______________ _____________________ ______ ______________ __ ________ GATEWAY 550 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D______________ 365 1-2PM FIRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25____________________ ] CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC.________ . MANNED TARPING AND TRIMMING STATIONS_______________________________________ ' MANNED WATER STATIONS FOR DUST CONTROL _______________ - MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________ ’ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING BAM VISTA & TOWER 2 CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ] ELEVATIONS; 1200-264. S50-274, 375-284, 365-274 LOADS OUT 49 /CS- Approved By: Title:__________ ,BY.\ For: ISUPERINTENDENT
CONFIDENTIAL CITY_2IMCl0 0_0 0214917 3 SUBJECT TO PROTECTIVE ORDER NO, 2, SEPT, 2008 NYC-WTC_000408035
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388713
Night shift daily workforce details for World Trade Center site, Nov 28, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388264
Day shift daily workforce for World Trade Center site, November 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305586
Day shift daily workforce and equipment at World Trade site, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305414
Final daily workforce and equipment at World Trade site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305374
Day shift final daily workforce report for World Trade Center site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305361
Night final daily workforce and equipment listing for World Trade Center site, including weather notes.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388228
Night final daily workforce and equipment at World Trade Center, November 28, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388713
Night shift daily workforce details for World Trade Center site, Nov 28, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388264
Day shift daily workforce for World Trade Center site, November 29, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
Similar indexed content
NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
Similar indexed content
NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
Similar indexed content
NYC-WTC_000388713
Night shift daily workforce details for World Trade Center site, Nov 28, 2001.
Similar indexed content
NYC-WTC_000388264
Day shift daily workforce for World Trade Center site, November 29, 2001.
Similar indexed content