NYC-WTC_000305241
Night preliminary daily workforce report for World Trade Center site, showing personnel and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Night preliminary daily workforce report for World Trade Center site, showing crews and machinery.
NYC-WTC_000305239OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 6tti Roa). Whitestone, N.Y. 11357-(718) 767-9000 DATE: DECEMBER 1.2001 (NIGHT PRELIMINARY) 8:00 PM DAILY WORK FORCE REPORT
Job Name Location: World Trade Center Contract No. Weather Cc nditions
Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINT! INDENT 2 CAT 966 LOADER 1 PROJECT E NGINEER 1 CAT 446 BACKHOE 1 OFFICE EN 3INEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OF FICER CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 <ERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 IwjaadtiisiiFt FOREMAN 235 HAMMER HOE RAM 1 teamsters 11 MECHANICS TRUCK 1 1 mechanics" 1 TOOL TRUCK 1 feCKERS HOUSE WRE 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1
Description )f Work: PRELIMINA ^Y/ANTICIPATED WORK____________________________________________________ CONTINUE ro EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC._____________ MAN TARPI SIG AND TRIMMING STATIONS_______________________________________________ MAN WATE STATIONS FOR DUST CONTROL___________________________________________ MAINTAIN 1RAFFIC FLOW IN AND OUT OF AREA_________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2 CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ELEVATlOh S: 1200-264. 550-274. 375-284, 365-274
GRACE CON :OR3--- I Approved B; Title: BY:^— For: SUPERINTENDENT
ciTY_2 iMCl 0 0_001231351 NYC-WTC_000305239
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305241
Night preliminary daily workforce report for World Trade Center site, showing personnel and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305363
Night final daily workforce and equipment listing for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280077
Night shift daily workforce and equipment for World Trade Center, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305042
Day final daily workforce and equipment at World Trade site, Dec 2, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279726
Night shift daily workforce/equipment summary for World Trade Center project, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291283
Daily workforce report for World Trade site, listing personnel and equipment by shift (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302417
Final daily workforce report for World Trade Center work, listing crew and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291284
Daily workforce record for World Trade site with equipment and personnel counts (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388359
Night shift daily workforce and equipment at World Trade site, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388706
Daily workforce listing by Grace Contracting for World Trade Center site, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388265
Night shift daily workforce for World Trade Center site, November 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305241
Night preliminary daily workforce report for World Trade Center site, showing personnel and machinery.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305363
Night final daily workforce and equipment listing for World Trade Center site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280077
Night shift daily workforce and equipment for World Trade Center, Nov 29, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305042
Day final daily workforce and equipment at World Trade site, Dec 2, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279726
Night shift daily workforce/equipment summary for World Trade Center project, Nov 29, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305241
Night preliminary daily workforce report for World Trade Center site, showing personnel and machinery.
Similar indexed content
NYC-WTC_000305363
Night final daily workforce and equipment listing for World Trade Center site.
Similar indexed content
NYC-WTC_000280077
Night shift daily workforce and equipment for World Trade Center, Nov 29, 2001.
Similar indexed content
NYC-WTC_000305042
Day final daily workforce and equipment at World Trade site, Dec 2, 2001.
Similar indexed content
NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
Similar indexed content