NYC-WTC_000279102
Building Department memo/guide related to emergency planning after 9/11.
2 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Guidance document related to environmental health at World Trade Center site.
NYC-WTC_000291428–000291461OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Protection from Chemical, Biological, or Radiological Attacks 13
systems should be isolated and the areas maintained at a neg ative pressure relative to the rest of the building, but at posi tive pressure relative to the outdoors. Physical isolation of these areas (well-sealed floor to roof-deck walls, sealed wall penetrations) is critical to maintaining the pressure differen tial and requires special attention to ensure airtight bound aries between these areas and adjacent spaces. In some build ing designs (those having lobbies with elevator access, for example), establishing a negative pressure differential will present a challenge. A qualified HVAC professional can assist in determining if the recommended isolation is feasible for a given building. In addition, lobbies, mailrooms, and loading docks should not share a return-air system or return pathway (e.g., ceiling plenum) with other areas of the building. Some of these measures are more feasible for new construction or buildings undergoing major renovation.
Building access from lobby areas should be limited by securi ty checks of individuals and packages prior to their entry into secure areas. Lobby isolation is particularly critical in build ings where the main lobbies are open to the public. Similar checks of incoming mail should also occur before its con veyance into the secure building areas. Side entry doors that circumvent established security checkpoints should be strictly controlled.
6. Secure return air grilles. Similar to the outdoor-air intake, nVAC return-air grilles that are publicly accessible and not easily observed by security may be vulnerable to targeting for CBR contaminants. Public access facilities may be the most vulnerable to this type of CBR attack. A building-security assessment can help determine, which, if any, protective measures to employ to secure return-air grilles. Take caution that a selected measure does not adversely affect the perform ance of the building HVAC system. Some return-air grille
CITY_21MC100_011104384
NYC-WTC_000291448
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279102
Building Department memo/guide related to emergency planning after 9/11.
2 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
6 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
4 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
4 shared non-person entities · 1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
4 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
3 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154452
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
3 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318340
Office findings on EPA response to World Trade Center issues; August 2003.
7 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000320059
Ambient and settled dust sampling protocol for residential areas near WTC.
7 shared non-person entities · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
1 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000411802
COSH-related NYC RO regulatory chapter on asbestos control.
Similarity score 0.941 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155604
Documentation tracking the collection and transfer of environmental samples related to cleaning operations at 114 Liberty Street.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162919
Documentation tracking the chain of custody for monitoring and cleaning work at 114 Liberty Street.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
Similar indexed content
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
Similar indexed content
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Similar indexed content
Building Department memo/guide related to emergency planning after 9/11.
Similar indexed content
NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
Similar indexed content