NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 34 pages

Guidance for Environments, NYC WTC

Machine-extracted title · confidence 35%

Guidance document related to environmental health at World Trade Center site.

NYC-WTC_000291428–000291461
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Protection from Chemical, Biological, or Radiological Attacks [5

♦ How is the building zoned? Where are the air handlers for each zone? Is the system designed for smoke control?

How does air flow through the building? What are the pressure relationships between zones? Which building entryways are pos­ itively or negatively pressurized? Is the building connected to other buildings by tunnels or passageways?

♦ Are utility chases and penetrations, elevator shafts, and fire stairs significant airflow pathways?

♦ Is there obvious air infiltration? Is it localized?

♦ Does the system provide adequate ventilation given the building’s current occupancy and functions?

* Where are the outdoor air louvers? Are they easily observable? Are they or other mechanical equipment accessible to the public?

♦ Do adjacent structures or landscaping allow access to the build ing roof?

SPECIFIC RECOMMENDATIONS The recommendations can be divided into four general categories: (1) things not to do; (2) physical security: (3) ventilation and filtration; and (4) maintenance, administration, and training. Some of these items, such as securing mechanical rooms, may be started prior to your completing the recommendations in the "Know your building" section. Items within each of the four categories are listed in the order of priority. Items considered to be highly critical are identified by “***” next to the number. As you review these recommendations, consider their potential implications upon the contract langdage

CITY_21MC100_011104376

NYC-WTC_000291440

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000291440Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Similar indexed content

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

Compare copies and versions →