NYC-WTC_000279102
Building Department memo/guide related to emergency planning after 9/11.
2 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Guidance document related to environmental health at World Trade Center site.
NYC-WTC_000291428–000291461OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
41 Protection from Chemical, Biological, or Radiological Attacks A:*;-'-; ' A:
Getting to know your building may best be handled by conduct ing a walk-through inspection of the building and its systems, including the HVAC, fire protection, and life-safety systems. During this inspection, compare the most up-to-date design drawings avail able to the operation of the current systems.* This step may require, or benefit from, the assistance of qualified outside professionals. + Without this baseline knowledge, it is difficult to accurately identify what impact a particular security modification may have on build ing operation. While it is important to understand how the existing building systems function, the systems need not operate per design before you implement security measures. A partial list of items to consider during your building walk-through includes;
What is the mechanical condition of the equipment?
♦ What filtration systems are in place? What are their efficiencies?
•S' Is all equipment appropriately connected and controlled? Are equipment access doors and panels in place and appropriately sealed?
* Are all dampers (outdoor air, return air, bypass, fire and smoke) functioning? Check to see how well they seal when closed.
♦ How does the HVAC system respond to manual fire alarm, fire detection, or fire-suppression device activation?
♦ Are all supply and return ducts completely connected to their grilles and registers?
4 Are the variable air volume (VAV) boxes functioning?
♦ How is the HVAC system controlled? How quickly does it respond?
Note: If sufficient questions or surprises arise from the building walk through, an independent evaluation by a qualified HVAC professional should be used to establish a useful baseline.
CITY_21MC100_011104375
NYC-WTC_000291439
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279102
Building Department memo/guide related to emergency planning after 9/11.
2 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
6 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143746
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
1 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
4 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
4 shared non-person entities · 1 shared topics · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
3 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
Environmental consultant work plan detailing asbestos abatement and demolition procedures for 133-135 Greenwich Street and 21-23 Thames Street.
4 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153468
Page containing illegible text and a document identifier for the EPA Inspector General series.
3 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154452
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
3 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318340
Office findings on EPA response to World Trade Center issues; August 2003.
7 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000320059
Ambient and settled dust sampling protocol for residential areas near WTC.
7 shared non-person entities · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165900
Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
1 shared non-person entities · 1 shared topics · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000163474
EPA website link and reference to environmental count data portal.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163320
Updated WTC access and building agreement documents incorporating FEMA comments with corrections from previous draft.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163314
Distribution of revised EPA access forms for WTC dust cleaning program with minimal substantive changes from previous version.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322244
Consulting report cover page for HVAC retrofitting and air quality at Ground Zero.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151425
Joint EPA and DEP notice describing the scope of dust removal and air monitoring for structures near Ground Zero.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278790
New York Council report on retrofitting HVAC systems at Ground Zero for IAQ.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000276036
Document discussing lessons learned in children's environmental health related to Ground Zero sites.
Similar indexed content
Letter summarizing real estate industry comments on draft EPA guidance for building air protection environments.
Similar indexed content
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Similar indexed content
Building Department memo/guide related to emergency planning after 9/11.
Similar indexed content
NYC-WTC_000142247
Generic DEP form from Box 06 with illegible content regarding environmental services.
Similar indexed content