NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

WTC emergency site health monitoring RFP, Oct 2001

Machine-extracted title · confidence 42%

RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.

NYC-WTC_000290906–000290920
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Schedule will include both twenty-four (24) hour a day monitoring, seven (7) days per week until directed to change by the site ES&H Director. Notice of additional changes to schedule will be made at least one week prior to anticipated change. Contractor is responsible for maintenance of sample and monitoring database for all data collected during the project. The Contractor is expected to provide sample analysis results to the overall WTC database in a format compatible with the selected format at no additional cost.

Site ES&H Director reserves the right to reject data not meeting Data Quality Objectives at no cost to the project. Site ES&H Director reserves the right to audit the Contractor facility and procedures. Deficiencies between stated qualifications and audit results will be corrected at no cost to the project. Contractor may substitute equivalent methods or procedures with approval of site ES&H Director.

Required Site Monitoring Site monitoring is required under the following conditions. • When required by the Subcontract, or task-specific HASP • When required by specific OSHA standards (e.g., asbestos, benzene,, lead,, carbon monoxide) • When worker exposure is reasonably anticipated to be greater than 50% of the OSHA j Permissible Exposure Limit (PELs), ACGIH TLV, or other recognized occupational I exposure limit • When necessary to verify the adequacy of hazard control measures and/or personal protective equipment, including respiratory protection • When necessary to assess and evaluate worker exposure, or to resolve worker complaints or concerns. With the approval of the site ES&H Director, site monitoring may be discontinued after representative initial monitoring is conducted and worker exposures are shown to be adequately controlled through the use of engineering, work practice, or personal protective equipment control measures. If work activities change so that the initial monitoring is no longer representative of worker exposure, monitoring must be reinitiated.

Monitoring Strategy The Contractor is expected to submit to the site ES&H Director an employee-Monitoring Plan that will provide the required information to identify and control workplace hazards. . Where monitoring is required, the Contractor shall develop and implement a monitoring program that considers the factors that may affect worker exposure and the following elements. • Monitoring requirements, contaminants, and monitoring equipment limitations • Subcontractor-specific work locations, work activities, work practices, personnel, and equipment to be used on site • Any additional site-specific hazard information gathered by the Subcontractor during development of the task-specific HASP

2 CITY_21MC100_007083350

NYC-WTC_000290910

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290910Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280660

Additional pages for the WTC health monitoring and sampling RFP, city file reference.

Similar indexed content

NYC-WTC_000317719

SOW describing general site exposure monitoring for WTC demolition/repair work.

Similar indexed content

NYC-WTC_000280647

Doc header for health monitoring and sampling RFP, 10/01/01, contract file.

Similar indexed content

NYC-WTC_000188121

Request for Proposal document from October 1, 2001, regarding health monitoring and sampling at the World Trade Center emergency site.

Similar indexed content

Compare copies and versions →