NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

WTC emergency site health monitoring RFP, Oct 2001

Machine-extracted title · confidence 42%

RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.

NYC-WTC_000290906–000290920
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

STATEMENT OF WORK: EXPOSURE MONITORING General Site monitoring shall be perfonned as necessary for site demolition and construction work. This statement of work covers general site monitoring for physical and chemical hazards including air contaminants (dust, metals, volatile organic compounds, and other specific compounds) heat stress, cold stress and noise.

Federal EPA, NIOSH, New York City DDC, New York DEC, and New York City Health Department may determine minimum site monitoring requirements. The Contractor is expected to conduct exposure monitoring for, WTC Disaster Project employees as required by OSHA or local requirements. All exposure data must be provided to site ES&H Director or his designee daily. Site ES&H Director will present accumulated data to the various Agencies as requested.

Specific Conditions The work schedule at the WTC is 24 hours a day/7 days a week. Sampling may be required at any time and sampling schedules should be designed to characterize the 24/7 schedule. Project duration is to be determined; but sampling schedule and number may be changed depending on planned tasks.

The Contractor must follow all provisions and conditions of the WTC Disaster Project. Site access will be determined by WTC site controller and the Contractor will be required to comply with all site access and security requirements.

The Contractor must supply the following information in the bid response: (1) Description of last 5 years of industrial hygiene sampling experience (2) Identification of analytical laboratory including certifications. (3) Qualifications of Contractor Project Manager (4) Quality Assurance Plan (5) List of proposed sampling equipment and instruments (6) Time and Material rates for sampling technician, sampling equipment use rates and lab sample cost (based on 24-hour report of results).

A list of samples collected and any direct reading instrument results must be provided to the DDC Safety Representative at the end of each day (note safety reps are on-site 24/7).

Contractor will develop a Sampling Plan including Data Quality Objectives as a deliverable within 3 days of contract award. The Sampling Plan will be reviewed within 2 days after receipt. Contractor will mobilize sampling technicians within 2 days of approval of Sampling Plan. The site ES&H Director or his designee will advise the Contractor Project Manager of planned site activities, as information is available.

1

CITY_21MC100_007083349

NYC-WTC_000290909

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290909Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280660

Additional pages for the WTC health monitoring and sampling RFP, city file reference.

Similar indexed content

NYC-WTC_000317719

SOW describing general site exposure monitoring for WTC demolition/repair work.

Similar indexed content

NYC-WTC_000280647

Doc header for health monitoring and sampling RFP, 10/01/01, contract file.

Similar indexed content

NYC-WTC_000188121

Request for Proposal document from October 1, 2001, regarding health monitoring and sampling at the World Trade Center emergency site.

Similar indexed content

Compare copies and versions →