10/01/01 MUN 10:09 FAX 212 695 5984 Bechtel URS Greiner JV 1^004
Schedule will include both twenty-four (24) hour a day monitoring, seven (7) days per week until
directed to change by the site ES&H Director. Notice of additional changes to schedule will be
made at least one week prior to anticipated change. Contractor is responsible for maintenance of
sample and monitoring database for all data collected during the project. The Contractor is
expected to provide sample analysis results to the overall WTC database in a format compatible
with the selected format at no additional cost.
Site ES&H Director reserves the right to reject data not meeting Data Quality Objectives at no
cost to the project. Site ES&H Director reserves the right to audit the Contractor facility and
procedures. Deficiencies between stated qualifications and audit results will be corrected at no
cost to the project. Contractor may substitute equivalent methods or procedures with approval of
site ES&H Director.
Required Site Monitoring
Site monitoring is required under the following conditions.
• When required by the Subcontract, or task-specific HASP
• When required by specific OSHA standards (e.g., asbestos, benzene,, lead,, carbon
monoxide)
• When worker exposure is reasonably anticipated to be greater than 50% of the OSHA
Permissible Exposure Limit (PELs), ACGIH TLV, or other recognized occupational
exposure limit
• When necessary to verify the adequacy of hazard control measures and/or personal
protective equipment, including respiratory protection
• When necessary to assess and evaluate worker exposure, or to resolve worker complaints
or concerns.
With the approval of the site ES&H Director, site monitoring may be discontinued , after .
representative initial monitoring is conducted and worker exposures are shown to be adequately
controlled through the use of engineering, work practice, or personal protective equipment
control measures. If work activities change so that the initial monitoring is no longer
representative of worker exposure, monitoring must be reinitiated.
Monitoring Strategy
The Contractor is expected to submit to the site ES&H Director an employee-Monitoring Plan
that will provide the required information to identify and control workplace hazards. . Where
monitoring is required, the Contractor shall develop and implement a monitoring program that
considers the factors that may affect worker exposure and the following elements.
• Monitoring requirements, contaminants, and monitoring equipment limitations
• Subcontractor-specific work locations, work activities, work practices, personnel, and
equipment to be used on site
• Any additional site-specific hazard information gathered by the Subcontractor during
development of the task-specific HASP
2
CITY_21MC100_002948039
NYC-WTC_000280649
OCR can misread numbers and units. Confirm readings against the page image before using them.