NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
5 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
NYC-WTC_000280681–000280682OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SampFreq
Sampling Frequency Based on Job Task 11/14/2001 Analyte Job Frequency
Carbon Monoxide Equipment Operators in Depressions 5 times per week Equipment Operators on Surface 2 times per week Total per week: 22 Flagger 1 time per week Spotters in Depression 5 times per week Spotters on Surface 2 times per week Torch Cutter in Depression 2 times per week Torch Cutter on Surface 1 time per week Truck Washer 3 times per week Water Spray Operator 1 time per week
Asbestos Flagger, Water Tower, Truck Washer Once per month Operators on Surface - Tower 1 3 times every two weeks Total per week: 15.5 Torch Cutter on Surface - Tower 1 1 time every two weeks Operators in Depression - Tower 1 2 times per week Spotter on Surface - Tower 1 1 time per week Spotter in Depression - Tower 1 3 times every two weeks Torch Cutter in Depression - Tower 1 1 time per week Operators on Surface - Other 1 time per week Operators in Depression - Other 2 times per week Spotter in Depression - Other 2 times per week Spotter on Surface - Other 2 times per week Torch Cutter in Depression - Other 1 time every two weeks Torch Cutter on Surface - Other Once per month
Dust/Metais Equipment Operator in Depression 2 times per week Equipment Operator on Surface 1 time per week Total per week: 9 Flagger, Water Tower. Truck Washer No Samples Spotter in Depression 2 times per week Spotter on Surface 1 time per week Torch Cutter in Depression 2 times per week Torch Cutter on Surface 1 time per week
DusVSilica Equipment Operator in Depression 2 times per week Equipment Operator on Surface 1 time per week Total per week: 7.25 Flagger, Water Tower, Truck Washer No Samples Spotter in Depression 2 times per week Spotter on Surface 1 time every 2 weeks Torch Cutter in Depression 1 time per week Torch Cutter on Surface Once per month
Aldehydes Equipment Operator in Depression 2 times per week Equipment Operator on Surface 1 time every 2 weeks Total per week: 7.5 Flagger, Water Tower, Truck Washer 1 time per week Spotter in Depression 2 times per week
Page 1
CITY_21MC100_002948078
NYC-WTC_000280681
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
5 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
5 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
4 shared non-person entities · 1 shared topics · similarity 0.839
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388279
Industrial hygiene air sampling results for the World Trade Center recovery area; guidance provided.
1 shared non-person entities · 1 shared topics · similarity 0.838
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000437318
Weekly summary of OELs and analyses for asbestos, metals, silica.
3 shared non-person entities · 1 shared topics · similarity 0.838
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
4 shared non-person entities · 1 shared topics · similarity 0.836
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
4 shared non-person entities · 1 shared topics · similarity 0.836
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342064
Laboratory results for air samples on Pier 25; includes asbestos-related findings and concentrations.
2 shared non-person entities · similarity 0.833
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149744
Policy document outlining NYPD access requirements for building owners and contractors at the site in October 2001.
5 shared non-person entities · 1 shared topics · similarity 0.834
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302240
OSHA sampling results: asbestos in financial district and rubble pile; results below/exceeding limits.
2 shared non-person entities · similarity 0.833
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
3 shared non-person entities · similarity 0.833
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000317719
SOW describing general site exposure monitoring for WTC demolition/repair work.
4 shared non-person entities · similarity 0.833
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similarity score 0.961 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000357863
Worker exposure data and shift-based sampling metrics for 08/2002.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similar indexed content
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similar indexed content
NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
Similar indexed content
NYC-WTC_000388279
Industrial hygiene air sampling results for the World Trade Center recovery area; guidance provided.
Similar indexed content
NYC-WTC_000437318
Weekly summary of OELs and analyses for asbestos, metals, silica.
Similar indexed content