NYC 9/11 Public Portal Document
IH Sampling Plan December 13, 2001
Aldehydes Equipment Operator in Depression 1 time per wreck Equipment Operator on Surface 1 time every 2 weeks Total per week: 4.5 Flagger, Water Spray Operator, Truck Washer 1 time per month Spotter in Depression 1 time per week Spotter on Surface 1 time every 2 weeks Torch Cutter in Depression 1 time every 2 weeks Torch Cutter on Surface 1 time per month Chain Saw Operator 1 time per month Cutting, Drilling, Breaking Concrete 1 time per month
Acid Scan Flagger, Water Spray Operator, Truck Washer No Samples Operators and Spotters in Depression 1 time per week Total per week: 2.5 Operators and Spotters on Surface 1 time every 2 weeks Torch Cutter in Depression 1 time every 2 weeks Torch Cutter on Surface 1 time per month Chain Saw Operator No Samples Cutting, Drilling, Breaking Concrete 1 time per month
Ozone Flagger, Water Spray Operator, Truck Washer No Samples Operators and Spotters in Depression 2 times per week Total per week: 5.5 Operators and Spotters on Surface 1 time per week Torch Cutter in Depression 1 time par waek Torch Cutter on Surface 1 time every 2 weeks Chain Saw Operator 1 time every 2 weeks (or as available) Cutting, Drilling, Breaking Concrete 1 time every 2 weeks
PAHs Flagger, Water Spray Operator, Truck Washer No Samples Operators in Depression 1 time per week Total per week:2.5 Operators on Surface No Samples Spotters and Torch Cutters in Depression 1 time per week Spotters and Torch Cutters on Surface No Samples Chain Saw Operator No Samples Cutting, Drilling, Breaking Concrete 1 time every 2 weeks
Aromatics Flagger, Water Spray Operator, Truck Washer No Samples Operators in Depression 1 time per week Total per week: 3 Operators on Surface No Samples Spotters and Torch Cutters in Depression 1 time per week Spotters and Torch Cutters on Surface No Samples Chain Saw Operator No Samples Cutting, Drilling, Breaking Concrete 1 time per week
Diesel Fume Operators in Depression 2 times per week Operators on Surface 1 time every 2 weeks Total per week. 8.5 Spotters and Torch Cutters in Depression 2 times per week Spotters and Torch Cutters on Surface 1 time every 2 weeks Truck Washers and Flaggers 2 times per week Water Truck 1 time every 2 weeks Chain Saw Operator 1 time every 2 weeks (or as available) Cutting, Drilling, Breaking Concrete 1 time every 2 weeks
Page 2
CITY_21MC100_002948072
NYC-WTC_000280679
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
5 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290906
RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.
5 shared non-person entities · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280660
Additional pages for the WTC health monitoring and sampling RFP, city file reference.
5 shared non-person entities · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
4 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
4 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280647
Doc header for health monitoring and sampling RFP, 10/01/01, contract file.
5 shared non-person entities · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
4 shared non-person entities · 1 shared topics · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280675
Proposed sampling plan allocations by analyte and job for WTC site sampling.
5 shared non-person entities · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000317719
SOW describing general site exposure monitoring for WTC demolition/repair work.
4 shared non-person entities · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209172
Document outlining NIOSH monitoring requirements for lead, asbestos, silica, and other contaminants during WTC torch cutting and rubble removal.
3 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000199683
Slide deck outline covering history, actual hazards, results, and occupational exposure limits related to the World Trade Center site.
5 shared non-person entities · 1 shared topics · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
Similarity score 0.929 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
Similarity score 0.928 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similar indexed content
NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similar indexed content
SOW describing general site exposure monitoring for WTC demolition/repair work.
Similar indexed content
NYC-WTC_000290906
RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.
Similar indexed content
Additional pages for the WTC health monitoring and sampling RFP, city file reference.
Similar indexed content