NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
NYC-WTC_000280678–000280680OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
IH Sampling Plan December 13, 2001
Analyte Frequency
Carbon Monoxide Equipment Operators in Depressions 3 times per week Equipment Operators on Surface 2 times per week Total per week: 22 Flagger 2 times per week Spotters in Depression 3 times per week Spotters on Surface 2 times per week Torch Cutter in Depression 2 times per week TOTCh Cutter on Surface 1 time per week Truck Washer 3 times per week Water Spray Operator 2 time per week Chain Saw Operator 1 time every 2 weeks (or as available) Cutting, Drilling, Breaking Concrete 1 time per week
Asbestos Flagger. Water Spray Operator. Truck Washer Once per month Operators on Surface - Tower 1 1 time per week Total per week; 11.75 Torch Cutter on Surface - Tower 1 1 time every 2 weeks Operators in Depression - Tower 1 2 times per week Spotter on Surface - Tower 1 1 time per week Spotter in Depression - Tower 1 1 time per week Torch Cutter in Depression - Tcwer 1 1 time per week Operators on Surface - Other 1 time every 2 weeks Operators in Depression - Other 1 time per week Spotter in Depression - Other 1 time per v/^ Spotter on Surface - Other 1 time per week Torch Cutter in Depression - Other 1 time every 2 weeks Torch Cutter at Surface - Other Once per month Chain Saw Operator Once per month Cutting, Drilling, Breaking Concrete 1 time every 2 weeks
Dust'Metals Equipment Operator in Depression 2 times per week Equipment Operator on Surface 1 time per week Total per week: 12 Flagger, Water Spray Operator, Truck Washer 1 time every 2 weeks Spotter in Depression 2 times per week Spotter on Surface 1 time per week Torch Cutter in Depression 2 times per week Torch Cutter on Surface 1 time per week Chain Saw Operator 1 time every 2 we^s (or as available) Cutting, Drilling, Breaking Concrete 2 times per week
OusVSilica Equipment Operator in Depression 2 times par week Equipment Operator on Surface 1 time per week Total per week: 9 Flagger, Water Spray Operator, Truck Washer No Samples Spotter in Depression 2 times per week Spotter on Surface 1 time every 2 weeks Torch Cutter in Depression 1 time every 2 weeks Torch Cutter on Surface No Samples Chain Saw Operator No Samples Cutting, Drilling, Breaking Concrete 3 times per week
Page 1
CITY_21MC100_002948071
NYC-WTC_000280678
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
5 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290906
RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.
5 shared non-person entities · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280660
Additional pages for the WTC health monitoring and sampling RFP, city file reference.
5 shared non-person entities · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
4 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
4 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280647
Doc header for health monitoring and sampling RFP, 10/01/01, contract file.
5 shared non-person entities · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
4 shared non-person entities · 1 shared topics · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280675
Proposed sampling plan allocations by analyte and job for WTC site sampling.
5 shared non-person entities · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000317719
SOW describing general site exposure monitoring for WTC demolition/repair work.
4 shared non-person entities · similarity 0.876
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209172
Document outlining NIOSH monitoring requirements for lead, asbestos, silica, and other contaminants during WTC torch cutting and rubble removal.
3 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000199683
Slide deck outline covering history, actual hazards, results, and occupational exposure limits related to the World Trade Center site.
5 shared non-person entities · 1 shared topics · similarity 0.867
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341542
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186590
Document listing revised sample counts per week for various analytes including asbestos, metals, and silica at the World Trade Center site.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280675
Proposed sampling plan allocations by analyte and job for WTC site sampling.
Similarity score 0.927 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Detailed weekly sampling and personnel deployment plan for IH monitoring.
Similar indexed content
NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similar indexed content
SOW describing general site exposure monitoring for WTC demolition/repair work.
Similar indexed content
NYC-WTC_000290906
RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.
Similar indexed content
Additional pages for the WTC health monitoring and sampling RFP, city file reference.
Similar indexed content