NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Detailed weekly sampling and personnel deployment plan for IH monitoring.
NYC-WTC_000341542–000341544OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
IH Sampling Plan December 13, 2001
Chain Saw Operator_____________ 1 time per month 0.25 Cutting, Drilling, Breaking Concrete 1 time per month 0.25 4,5 4.5
Acid Scan Flagger, Water Spray Operator, Truck Washer No Samples 0 Operators and Spotters in Depression________ 1 time per week 1 Total per week: 2.5 Operators and Spotters on Surface__________ 1 time every 2 weeks 0.5 Torch Cutter in Depression_________________ 1 time every 2 weeks 0.5 Torch Cutter on Surface 1 time per month 0.25 Chain Saw Operator No Samples 0 Cutting, Drilling, Breaking Concrete 1 time per month 0.25 2.5 2.5
Ozone Flagger, Water Spray Operator, Truck Washer No Samples 0 Operators and Spotters in Depression 2 times per week 2 Total per week: 5.5 Operators and Spotters on Surface__________ _________ 1 time per week__________ 1 Torch Cutter in Depression_________________ _________ 1 time per week__________ 1 Torch Cutter on Surface 1 time every 2 weeks 0.5 Chain Saw Operator_______________________ 1 time every 2 weeks (or as available) 0.5 Cutting, Drilling, Breaking Concrete 1 time every 2 weeks 0.5 5.5 5.5
PAHs Flagger, Water Spray Operator, Truck Washer No Samples 0 Operators in Depression___________________ 1 time per week 1 Total per week:2.5 Operators on Surface No Samples 0 Spotters and Torch Cutters in Depression __l_tirne_ge£week__ 1 Spotters and Torch Cutters on Surface_______ No Samples 0 Chain Saw Operator_______________________ No Samples 0 Cutting, Drilling, Breaking Concrete 1 time every 2 weeks 0.5 2.5 2.5
Aromatics Flagger, Water Spray Operator, Truck Washer No Samples 0 Operators in Depression 1 time per week 1 Total per week: 3 Operators on Surface______________________ No Samples 0 Spotters and Torch Cutters in Depression 1 time per week 1 Spotters and Torch Cutters on Surface_______ No Samples 0 Chain Saw Operator_______________________ No Samples 0 Cutting, Drilling, Breaking Concrete 1 time per week 1 3 3
Diesel Fume Operators in Depression_______________ 2 times per week 2 Operators on Surface__________________ _______ 1 time every 2 weeks________ 0.5 Total per week: 8.5 Spotters and Torch Cutters in Depression ________ 2 times per week__________ 2 Spotters and Torch Cutters on Surface _______ 1 time every 2 weeks________ 0.5 Truck Washers and Flaggers___________ 2 times per week 2 Water Truck _______ 1 time every 2 weeks________ 0.5 Chain Saw Operator__________________ 1 time every 2 weeks (or as available) 0.5 Cutting, Drilling, Breaking Concrete 1 time every 2 weeks 0.5 8.5 8.5
Noise Operators in Depression 1 time per week 1 Operators on Surface 1 time every 2 weeks 0.5 Total per week: 5.25 Spotters and Torch Cutters in Depression 1 time every 2 weeks 0.5 Spotters and Torch Cutters on Surface 1 time every 2 weeks 0.5 Truck Washers and Flaggers___________ 1 time per week 1 Water Truck 1 time per month 0.25 Chain Saw Operator___________________ 1 time every 2 weeks 0.5 Cutting, Drilling, Breaking Concrete 1 time per week _!_ 5.25 5.25
Hydrogen Sulfide Area Samples in SW Comer 4 times per week 4 Workers in SW Comer 4 times per week 4 Total per week: 8 8 8
Page 2
CITY_21MC100_006695463
NYC-WTC_000341543
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
6 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
5 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
4 shared non-person entities · 1 shared topics · similarity 0.881
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
4 shared non-person entities · 1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
4 shared non-person entities · 1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290906
RFP header for health monitoring and sampling at WTC emergency site, Oct 2001.
6 shared non-person entities · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280660
Additional pages for the WTC health monitoring and sampling RFP, city file reference.
6 shared non-person entities · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280647
Doc header for health monitoring and sampling RFP, 10/01/01, contract file.
6 shared non-person entities · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419329
Monitoring plan table listing lead, asbestos, and other controls for site activities.
4 shared non-person entities · 1 shared topics · similarity 0.860
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209172
Document outlining NIOSH monitoring requirements for lead, asbestos, silica, and other contaminants during WTC torch cutting and rubble removal.
3 shared non-person entities · 1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000317719
SOW describing general site exposure monitoring for WTC demolition/repair work.
5 shared non-person entities · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000289774
Silica sample results and OEL comparisons from 02/08/02 to 02/15/02 at the WTC-related site.
4 shared non-person entities · 1 shared topics · similarity 0.861
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.960 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280678
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
Similarity score 0.933 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Sampling plan and staffing schedule for depressions and surfaces in project work, December 2001.
Similar indexed content
NYC-WTC_000280681
Records listing sampling frequency and personnel allocation for depressions and surface areas at water tower site.
Similar indexed content
NYC-WTC_000266929
Monitoring plan listing asbestos and other dust-related controls per area.
Similar indexed content
NYC-WTC_000291425
Attachment: monitoring plan table with asbestos and crystalline silica per shift.
Similar indexed content
NYC-WTC_000429605
Table outlining monitoring requirements for asbestos-related tasks and related shifts.
Similar indexed content