NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Invoice: Offsite and onsite testing, PATH tubes

Machine-extracted title · confidence 34%

Time and personnel hours for air monitoring and pump operations related to World Trade Center site work, Nov 2001.

NYC-WTC_000278626–000278627
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

S, CONSTRUCTION ENGINEERING & MANAGEMENT, INC. I CEM 118 ROUTE 23 NORTH HAMBURG, NEW JERSEY 07419 (973) 827-3809 FAX (973) 827-0068

CONSTRUCTION MANAGEMENT TIME FOR MORETRENCH AMERICAN

ORLD TRADE CENTER, NYC MORETRENCH JOB # 01-4906

FOR BOVIS LEND LEASE LMB, INC.

Time for James J. Guldner, PE: November 11 through November 30,2001

1 I -12-01 Offsite 0,75 hr Air monitoring procedure; pump operators rates

11-13-01 Offsite 1.25 hrs Prepare for meeting with P.Ashlin; review personnel expenses

11-14-01 Onsite 7.75 hrs North & South PATH tubes pumping; mid-river pump operation; review flow rates; meeting with P. Ashlin re: invoicing criteria

Offsite 4.00 hrs Prepare Invoice #3; future invoicing criteria

11-15-01 Offsite 2.00 hrs Union hourly rate sheet; review Driller’s invoice; review insurance items with foreman

11-16-01 Offsite 2.25 hrs Telcon with P. Ashlin re: union hourly rate sheet, indemnification and payments

11-19-01 Offsite 0.25 hr South PATH tube water level

11-20-01 Offsite 4.25 hrs Prepare draft letter responding to Ashlin meeting and to M. Ross memo

11-21-01 Offsite 0.75 hr Job progress; PATH tube pumping flow rates; telcon with P. Ashlin re: payment

CITY_21MC100_004688337

NYC-WTC_000278626

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278626Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Construction management invoice, May 2002

NYC-WTC_000178383

Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.

Similar indexed content

Compare copies and versions →