D&C project dewatering & grouting plan, Rockaway

Machine-extracted title · confidence 42%

Construction management notes for dewatering, sump pumping and grouting at Rockaway project site.

NYC-WTC_000246816–000246818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

CONSTRUCTION ENGINEERING & MANAGEMENT, INC. CEM 118 ROUTE 23 NORTH HAMBURG, NEW JERSEY 07419 (973) 827-3809 FAX (973) 827-0068

CONSTRUCTION MANAGEMENT TIME FOR MORETRENCH AMERICAN

WORLD TRADE CENTER, NYC MORETRENCH JOB # 01-4906

FOR BOVIS LEND LEASE LMB, INC.

Time for James J. Guldner, PE; January 1 through January 31, 2002

01-02-02 Offsite 0.75 hrs Water supply for Tieback operation; winter safety

01-03-02 Offsite 1.50 hrs Response to “Meal-Time” Union Regs; Job progress

01-04-02 Offsite 2.50 hrs Response to Equipment O&M w/o labor; water supply; sump pumping for Tully

01-05-02 Offsite LOO hr Union benefits; South Projection pumping; dewatering well pumps (3) added on line

01-07-02 Offsite 1.50 hrs Water supply fusing; meter readings due to rain

01-08-02 Offsite 1.50 hrs Grouting of slurry wall “seams” planning; discharge water treatment system with GWTT

01-09-02 Offsite 4.25 hrs Discharge treatment system procedure; M. Ross invoice

01-10-02 Offsite 1.25 hrs Discharge treatment system; j ob progress

01-12-02 Offsite 3.75 hrs Draft response letter to R. Ferraro; local union benefits

01-13-02 Offsite LOO hr Sump operations and backup diesel pump; aluminum discharge piping; grout operation; manpower needs

01-14-02 Offsite 6.25 hrs Telcon P. Ashlin; grout mobilization & manpower; letter to Ferraro; Vendex letter response

Q2.4Q33Q5

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_003495719 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000246817

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000246817Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Construction management invoice, May 2002

NYC-WTC_000178383

Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.