Construction time records for Moret trench job related to WTC project, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗Construction management notes for dewatering, sump pumping and grouting at Rockaway project site.
NYC-WTC_000246816–000246818OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
01-15-02 Offsite 0.50 hr Grout mobilization; possible pumping near Church St.
01-16-02 Offsite 1.75 hrs Telcon P. Ashlin; sump pumping; grout drilling
01-17-02 Offsite 3.50 hrs Cost analysis; telcon M. Ross; grout operation
01-18-02 Offsite 6.75 hrs DOI audit; equipment insurances; grouting & sumping progress; pump requirements with backup pump for NYCTA 1&9 line
01-19-02 Offsite 2,50 hrs Union pump operators analysis
01-20-02 Offsite 0.75 hr Job progress; subway pump
01-21-02 Offsite 2.50 hrs Subway 1&9 pumping rate; union pump operators
01-22-02 Offsite 4.00 hrs Air monitoring; generators and pumps utilization; invoice
01-23-02 Offsite 0.25 hr Invoice
01-24-02 Offsite 11.75 hrs Invoice; air monitoring; subway 1 &9 pumping rate; Grouting slurry wall seams
01-25-02 Offsite 0.50 hr Air monitoring
01-26-02 Offsite 1.25 hrs Bovis three memos
01-27-02 Offsite 0.75 hr Daily logs; sumping progress
01-28-02 Offsite 1.25 hrs Grout status with materials
01-29-02 Onsite 9.25 hrs Meeting P. Ashlin; grouting slurry wall seams and set-up to grout tieback trumpets; sump pump down; air monitoring; water level readings
01-29-02 Offsite 2.00 hrs Review air and water level readings
01-30-02 Offsite 2.25 hrs Safety meetings; sump pumps utilization
01-31-02 Offsite 3.00 hrs Sign-in sheets; grouting safety; premium time
Total 79.75 hrs
02.403306
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_003495720 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000246818
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000339427
Construction time records for Moret trench job related to WTC project, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
Similar document embedding; no shared entity or topic indexed. · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268674
Invoice from CEM for dewatering and site management linked to World Trade Center project.
1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278626
Time and personnel hours for air monitoring and pump operations related to World Trade Center site work, Nov 2001.
1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
1 shared non-person entities · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000137580
Cover sheet for a file folder containing World Trade Center environmental protection records from the Office of the Mayor.
1 shared non-person entities · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105155
Cover letter submitting bulk sample results and air monitoring data for 17 Battery Place to the DEP.
1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106161
Letter from Mott & Prince Management responding to DEP inquiries about building maintenance and re-occupancy at 114 Chambers Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138131
Cover sheet for a file folder containing World Trade Center environmental protection records from the Office of the Mayor.
Similar document embedding; no shared entity or topic indexed. · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102558
Multi-page financial or administrative document related to DEP work, with minimal legible content visible in the excerpt.
1 shared topics · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126218
Department of Environmental Protection internal menu form dated December 12, 2006, associated with the building at 20 Dey Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
Similar document embedding; no shared entity or topic indexed. · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000339427
Construction time records for Moret trench job related to WTC project, Jan 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278626
Time and personnel hours for air monitoring and pump operations related to World Trade Center site work, Nov 2001.
Similarity score 0.935 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126787
Letter dated October 4, 2002 from Management Corp enclosing executed asbestos permit applications for 100 Church Street.
Similarity score 0.916 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173495
Urgent fax from the Mayor's Office of Emergency Management detailing required fiber optic and A/V equipment installation at 7 World Trade Center.
Similarity score 0.913 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104886
Fragmented text from a document describing asbestos abatement and cleanup procedures for the five-story building at 102-104 Greenwich Street.
Similarity score 0.911 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118359
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
Similarity score 0.911 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000339427
Construction time records for Moret trench job related to WTC project, Jan 2002.
Similar indexed content
NYC-WTC_000178383
Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.
Similar indexed content
NYC-WTC_000268674
Invoice from CEM for dewatering and site management linked to World Trade Center project.
Similar indexed content
NYC-WTC_000278626
Time and personnel hours for air monitoring and pump operations related to World Trade Center site work, Nov 2001.
Similar indexed content
NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar indexed content