NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Invoice: Offsite and onsite testing, PATH tubes

Machine-extracted title · confidence 34%

Time and personnel hours for air monitoring and pump operations related to World Trade Center site work, Nov 2001.

NYC-WTC_000278626–000278627
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

11-23-01 Offsite 0.50 hr Review draft letter to Ashlin

11-26-01 Offsite 4.75 hrs Finalize letters to Ashlin and Ross; Local 147 benefits

11-27-01 Offsite 3.50 hrs GWTT invoicing procedure; local 147 benefits; mid­ river status; generator power station location

11-28-01 Onsite 6.00 hrs Meeting with M. Ross re: letter responses; re-install mid-river pump with crew, including safety issues in tunnel; discharge piping and manhole progress; equipment taken off site

Offsite 4.50 hrs Payments to unions and to driller; review daily logs; prepare FOGM standards

11- 29-01 Offsite 2.50 hrs ID tags on all equipment; Local 147 benefit plans; discharge line progress

11 - 30-01 Offsite 0.50 hr Summary of equipment on rental vs. tagged items

Total 45.50 hrs

CITY_21MC100_004688338

NYC-WTC_000278627

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278627Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Construction management invoice, May 2002

NYC-WTC_000178383

Invoice for construction management services including dewatering and slurry wall panel work at the World Trade Center site in May 2002.

Similar indexed content

Compare copies and versions →