NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Nov 16, 2001

Machine-extracted title · confidence 36%

Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.

NYC-WTC_000278578
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: NOVEMBER 16, 2001 FINAL AJI (5-KI— DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Con COLD. WINDY SEASONAL

Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750.GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOFt 1 CARPENTER FOFiEMAN MECHANICS TRUCK 1 1 TEAMSTERS 13 TOOL TRUCK MECHANICS 1 TOOL VAN HOUSE WRECKERS 9 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 9 PARTS TRUCK ' 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 ■ OFFICE TRAILER 1 TUBE TRAILER 3 ■ FLAT TRUCK 1 PUMP 1 ANGEL AERIEL(DUST SUPR 1 85' GENIE LIFT 1 CAT 235 HOE RAM 1

Description of Work:_________________________________________________________ ’ CONTINUED TO LOOK FOR CHILLER ROOM UNDER BOVIS DIRECTION_____________ __ 750 BROKE DOWN ( BOOM STICK BUSHING.GRAPPLE BENT,GRAPPLE PISTON LEAKING) MANNED WATER STATIONS FOR DUST CONTROL________________________________ __ MANNED TARPiNG AND TRIMMING STATIONS______________________________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________________________ CONTINUE REMOVING DEBRIS FROM TOWER 2__________________________________ : LOADS OUT 47

GRACE CONTRACTING CORP Approved By: \ Title: BY: For: SUPERINTENDENT u

CITY_21MC100_004688173

NYC-WTC_000278578

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000278578Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Daily work force report · page 1

NYC-WTC_000388180

Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.

Similarity score 0.997 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Daily work force report

NYC-WTC_000388180

Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.

Similar indexed content

Compare copies and versions →