NYC-WTC_000305571
Final daily labor and seasonal conditions; World Trade site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗Final daily workforce report with cold, wind conditions, World Trade Center site, Nov 16, 2001.
NYC-WTC_000291259OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. ISMS 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: NOVEMBER 16, 2001 FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Con COLD. WINDY SEASONAL
Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_________ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 13 TOOL TRUCK MECHANICS 1 TOOL VAN HOUSE WRECKERS 9 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 9 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK 1 PUMP 1 ANGEL AERIEL(DUST SUPR) 1 85' GENIE LIFT 1 CAT 235 HOE RAM 1
Description of Work:______________________________________________________________ CONTINUED TO LOOK FOR CHILLER ROOM UNDER BOVIS DIRECTION________________ 750 BROKE DOWN ( BOOM STICK BUSHING,GRAPPLE BENT,GRAPPLE PISTON LEAKING) MANNED WATER STATIONS FOR DUST CONTROL__________________________________ MANNED TARPING AND TRIMMING STATIONS______________________________________ MANNED WATER STATIONS FOR DUST CONTROL__________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM TOWER 2_________________________________ __ LOADS OUT 47
GRACE CONTRACTING CORP Approved By: Title: ~ BY: 4^^ 1 For: SUPERINTENDENT
CITY_21MC100_004956878
NYC-WTC_000291259
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305571
Final daily labor and seasonal conditions; World Trade site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408060
Daily workforce and equipment counts for World Trade Center site, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388215
Daily workforce and equipment at World Trade Center site, November 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388255
Weather-influenced daily workforce and equipment at World Trade Center site, Nov 16, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388180
Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429693
Daily workforce and equipment details for World Trade Center project in Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305570
Final daily labor and equipment counts for World Trade site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388195
Night shift daily workforce and equipment listing for World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419092
Final daily workforce report for World Trade Center construction, Grace Contracting, Nov 25, 2001 (Day).
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388337
Daily workforce and equipment listing for World Trade Center site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305571
Final daily labor and seasonal conditions; World Trade site, Nov 16, 2001.
Similar indexed content
NYC-WTC_000408060
Daily workforce and equipment counts for World Trade Center site, Nov 2001.
Similar indexed content
NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
Similar indexed content
NYC-WTC_000388215
Daily workforce and equipment at World Trade Center site, November 16, 2001.
Similar indexed content
NYC-WTC_000388255
Weather-influenced daily workforce and equipment at World Trade Center site, Nov 16, 2001.
Similar indexed content