NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Final daily labor and seasonal conditions; World Trade site, Nov 16, 2001.
NYC-WTC_000305571OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: NOVEMBER 16. 2001 FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Con COLD, WINDY SEASONAL
Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE' SUPERINTENDENT 1 CAT966 LOADER 1 PROJECT ENGINEER 1 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 I LOCAL 14_________ 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER_______ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN MECHANICS TRUCK 1 1 TEAMSTERS 13 TOOL TRUCK MECHANICS 1 TOOL VAN HOUSE WRECKERS 9 ROLL OFF DUMP TRAILERS 9 LOW BED TRAILER HIGH DECK TRAILERS 3 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 9 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER 3 FLAT TRUCK 1 PUMP 1 ANGEL AERIEL(DUST SUPR) 1 85' GENIE LIFT 1 CAT 235 HOE RAM 1
Description of Work:________________________________________________________________ CONTINUED TO LOOK FOR CHILLER ROOM UNDER BOVIS DIRECTION________________ 750 BROKE DOWN ( BOOM STICK BUSHING,GRAPPLE BENT,GRAPPLE PISTON LEAKINGT MANNED WATER STATIONS FOR DUST CONTROL___________________________________ MANNED TARPING AND TRIMMING STATIONS_______________________________________ MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ~ CONTINUE REMOVING DEBRIS FROM TOWER 2___________________________________ _ LOADS OUT 47
GRACE CONTRACTING CORP Approved By: Title: ~BY: 1 CTBI For: SUPERINTENDENT I
CITY_2IMCl00_000926456 NYC-WTC_000305571
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408060
Daily workforce and equipment counts for World Trade Center site, Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388215
Daily workforce and equipment at World Trade Center site, November 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388255
Weather-influenced daily workforce and equipment at World Trade Center site, Nov 16, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388180
Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429693
Daily workforce and equipment details for World Trade Center project in Nov 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291259
Final daily workforce report with cold, wind conditions, World Trade Center site, Nov 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291285
Night shift daily workforce report for World Trade site, listing crew and equipment (Dec 2001).
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388195
Night shift daily workforce and equipment listing for World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279987
Daily workforce roster for World Trade Center site, November 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305570
Final daily labor and equipment counts for World Trade site, Nov 15, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291271
Day final daily workforce report for World Trade Center project, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408060
Daily workforce and equipment counts for World Trade Center site, Nov 2001.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388215
Daily workforce and equipment at World Trade Center site, November 16, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388255
Weather-influenced daily workforce and equipment at World Trade Center site, Nov 16, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388180
Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429693
Daily workforce and equipment details for World Trade Center project in Nov 2001.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278578
Daily workforce and equipment listings for World Trade Center site, Nov 16, 2001.
Similar indexed content
NYC-WTC_000408060
Daily workforce and equipment counts for World Trade Center site, Nov 2001.
Similar indexed content
NYC-WTC_000388215
Daily workforce and equipment at World Trade Center site, November 16, 2001.
Similar indexed content
NYC-WTC_000388255
Weather-influenced daily workforce and equipment at World Trade Center site, Nov 16, 2001.
Similar indexed content
NYC-WTC_000388180
Cold, wind seasonal daily workforce and equipment log for World Trade site, Nov 16, 2001.
Similar indexed content